对工程项目设计阶段的造价控制进行了分析与论述。
Shallow discussion in the hospital capital construction project the contract management and the construction cost control;
论述了工程项目造价控制贯穿于项目建设的全过程,项目设计阶段则是造价控制的关键环节。
The project cost control run through the whole course of construction, and the design stage is a key link.
项目设计阶段是工程造价控制的关键阶段,但目前我们对设计阶段的造价控制的力度还是不够的。
The design stage is the key part in the control of construction cost, but, there is always short of strength of cost control in design phase.
我看到过SOA项目在设计阶段以后就把WSDL固定下来。
I have seen SOA projects set their WSDL in stone after a design phase.
设计阶段的成本控制是工程项目成本控制的关键与重点。
Design cost control is the key to project cost control and focus.
该项目目前处于施工图设计阶段。
但这个项目在设计阶段就流产了,未曾量产和服役。
但这个项目在设计阶段就流产了,未曾量产和服役。
应用推荐