若计划在一个生产环境内运行此例程,可以考虑在维护窗口期间或是当系统处于轻负载的情况下运行它。
If you are planning to run this routine in a production environment, consider running it during a maintenance window or when the system is under a light load.
这份合同是美国空军的“网络以及空间运行和维护”计划的一部分。
The contract is for the Air Force's Network and Space Operations and Maintenance program.
绝不要假定程序中的一切都将按计划运行。
Never assume that everything in your program will work as planned.
运行db2exfmt生成访问计划
运行JMeter并创建一个测试计划。
运行db 2 exfmt生成访问计划(参见下载)。
在另一个示例中,我们找到一个计划每小时运行一次的代理。
In another example, we found an agent that was scheduled to run hourly.
现在,构建应该按计划自动运行。
无论如何,人们都得等待,而计算机按照它们自己的计划在运行。
In any case, people wait while computers operate on their own schedules.
计划是否按照既定方案运行?
每次运行该单元测试时,就会首先运行该数据生成计划,从而为测试创建数据。
Each time that you run the unit test, the data generation plan is run first to create the data for the test.
可现在运行备份或计划以后再运行。
显示计划任务程序上一次运行的程序的日志。
Displays a log of the programs that Task Scheduler has run recently.
每次生产计划调整后要能成功及时运行MRP。
Co-ordination of a successful MRP run following each plan release.
若要生成数据,必须创建并运行一个数据生成计划。
To generate data, you must create and run a data generation plan.
如何:运行数据生成计划以生成数据。
企业的生产经营总是处于动态之中,实际的运行会与计划有所偏差。
Production and operations is always in dynamic into the actual operation will deviate from plan.
预览数据并不能保证计划将成功运行。
Previewing the data does not guarantee that the plan will run successfully.
但是,该专门化的计划仅在正常办公时间运行。
However , this specialized schedule will only run after normal office hours.
例如,一份工作可以运行一个应用程序,如每周工资计划。
For example, a job could be the running of an application program such as a weekly payroll program.
这意味著你要下载的“试运行”,这一计划是免费的。
Which means that you get to download and "test-run" the program free of charge.
协助制定设备预防性维修计划,建立设备运行档案。
Assistance to prepare preventive maintenance plan and equipment operation file.
列车计划与实迹运行图的比较和计算机辅助调度功能。
Programme and the train is running track and the plan is relatively computer-aided dispatch functions.
计划、组织和执行机械设备维修,确保生产正常运行。
Planning, organization and execution MECHANICAL equipment maintenance to ensure daily production operation.
使用“任务计划程序”安排自动运行的计算机任务。
Use task Scheduler to schedule computer tasks to run automatically.
计划任务服务无法从命令行运行。
The Task Scheduler service should not be run from the command line!
轴承须有计划寿命为十万小时(100,000)的运行时间。
Bearings shall have a planned lifetime of one hundred thousand (100,000) running hours.
“任务计划程序服务”没有在作业服务器上运行。
任务计划程序服务未运行。
这项计划是重要的稳定和安全运行的计算机,而不应被终止。
This process is a security risk and should be removed from your system.
应用推荐