负责与客户建立积极的关系。
Be responsible for developing positive relationships with customer.
但如果我们冷静一想,这是对爱的一种负责与保护。
But if we want to cool one, this is a responsible love and protection.
负责与客户的项目沟通、技术协调等?
To be responsible for communication, technical coordination for project cooperation with clients?
负责与市场部门间商业事项的资讯提供。
Responsible for commercial matters between the Marketing Department and information provided.
负责与能处理部份的帐户。
客户服务专员负责与EF学员的日常沟通。
Student Service Associate will communicate with EF student on a daily base.
我们不负责与未经核实的数据使用的不良后果。
We are not responsible for the adverse consequences with unverified use of the data.
系统是引擎中负责与机器本身进行交流的部分。
System is the part of the engine that communicates with the machine itself.
负责与客户沟通,收集客方意见及跟进项目进程。
Gather project requirement from client to define project progress.
负责与印刷厂充分接洽,确保设计方案的准确实施。
Is responsible for printing the full contact to ensure the accurate implementation of the design.
MStudent模型负责与数据库内的student表进行交互。
The MStudent model is responsible for interacting with the student table in the database.
它应该有一个列说明问题、工具或方法、谁负责与截止日期。
It should have a column for the question, the tool or method, who is responsible, and the due date.
秩序与纪律已交由管控机构负责。
Order and discipline have been placed in the hands of governing bodies.
他们与IT部门共同负责管理这些规则。
这一切皆与成为负责任的公民有关。
小脑负责维持身体平衡,与协调动作。
The cerebellum is responsible for body balance and muscular coordination.
负责项目组的全面管理与领导。
Has the overall management and leadership responsibility for the project team.
比如,延脑负责心率与呼吸
The medulla, for instance, is responsible for heart rate and respiration.
您与营销负责人进行了第一次会面,并听取了他或她的想法。
You have an initial meeting with the marketing director and hear his or her ideas.
他是耶鲁大学精神疾病与法律项目的负责人,精神病学教授。
a professor of psychiatry and director of the psychiatry and law program at Yale University.
与产品负责人紧密合作,确保他们清楚地理解这个分界线。
Work closely with the product owner and make sure they clearly understand that boundary.
寻求与一位经验丰富的负责人一同完成项目。
数据访问对象负责管理与数据源的连接,来获取和储存其中的数据。
The DAO manages the connection with the data source to obtain and store data.
最终他成为了MGM(米高梅)美国区外发行与营销的负责人。
Eventually he became head of distribution and marketing outside America at MGM.
追踪:不负责任的架构与差劲的架构师。
就遇到的情况与团队或项目负责人以及一起合作的其他开发人员进行沟通。
Talk with your team or project leader and fellow developers about the situation.
上述时代错误,已由时代负责,任何组织与个人均负不起责任。
The anachronism, by the time responsible for any organizations and individuals can not take responsibility.
负责设计项目与甲方的汇报交流。
负责设计项目与甲方的汇报交流。
应用推荐