分析了每步迭代所需的计算工作量和速度增长倍数。
We analysed the amount of calculating work and the rate of speed increase.
因此每天的计算工作量繁重。
该法需要重复多次测量和计算,才能确定边桩的位置,野外工作量较大。
This work has to be done with lot of survey and calculation.
目前罐笼的设计过程漫长,手工计算工作量庞大。
There is a long process and huge workload during cage design.
目前罐笼的设计过程漫长,手工计算工作量庞大。
There is a long process and huge workload during cage design.
应用推荐