介绍了目标成本管理的内容。
The content of cost management by planned target is presented.
负责技术选型,设计工期和目标成本的控制;
In charge of the technical choice and the achievement of time and cost targets;
目标成本管理是现代企业经营管理的重要组成部分。
The target cost management is an important part in the management of a modern enterprise.
核算项目成本,并比较实际成本与项目目标成本的差异。
Cost calculation for each project, compare the actual cost with project target cost.
目标成本管理是符合石油企业自身特点的成本控制方法。
Target cost management is a cost control method according with oil enterprises' own characteristics.
目标成本管理即是根据目标管理的理论而建立的一种成本管理方法。
The target cost management is just a cost management method which build on target management theory.
时至今日,仍有许多研发项目不能满足目标成本、时间或质量的要求。
Many R&D-projects can not yet meet target costs, target time or target quality.
所谓目标成本是企业在生产经营活动中某一时期要求实现的产品成本水平。
Target cos is product cost level which enterprise to achieve in production and operation activities.
他们的首要目标是维持低成本。
确保工作流程到位,满足质量,数量以及成本目标。
Ensure process in place to meet quality, quantity, and cost targets.
挑选合适的供应商以保证能达到产品质量和成本预算目标的要求。
Selection of supplier and solution to achieve the quality and cost target of the products.
管理的第一目标是使较高工资与较低的劳动成本结合起来。
Management of the first goal is to make higher wages and lower labor costs.
一个流畅的流程运作是满足我们生产目标和成本目标的关键。
A smooth flow is the key to meeting our production goals and cost targets.
管理的第一目标是使较高工资与较低的劳动成本结合起来。 。
Management tof the first goal is to make higher wages and lower labor costs.
当时,各大汽车制造商的目标是削减品牌和车型,节省成本。
Back then, the goal was to pare back brands and models to save money.
成本分析是这一目标实现的前提。
不过,降低生活成本并不是她的唯一目标。
However, living cheaper is not the only goal she has in mind.
营销目标:成本毛利率达到200%。
工业产品的高质量和低成本是企业在生产中追求的目标。
The industrial products of high quality and low cost is production goal of an enterprise.
为每项目标加入成本金额。
这种体制降低了系统的成本和体积,有利于真假目标的识别。
This system can reduce the cost and volume, and is good for target identification.
目标责任成本管理是工程项目管理的中心内容。
The cost management by objective is the central part of engineering project management.
目标函数是光学系统的最低制造成本。
The objective function, is the minimum fabrication cost of the optical system.
成本。进度控制是管理的主要目标。
工程建设项目的成本、进度与质量一起并称为建设项目管理的三大控制目标。
The cost, schedule and quality are the most important aim of control in the construction project.
我们的目标是帮助我们的客户,以降低成本,从时间,以时间。
We aim to help our customers to cost down from time to time.
我们的目标是帮助我们的客户,以降低成本,从时间,以时间。
We aim to help our customers to cost down from time to time.
应用推荐