他们索要工程进度报告。
为在进度中的工程建立存款制度。
那个新的建筑工程已经进度落后,还超出预算。
That new construction project is behind schedule and over budget.
由于下雨,导致地铁的工程进度落后。
Because of rain, construction on the subway system fell behind schedule.
工程的进度大大加快了。
质量控制和进度控制是工程管理的主要内容和方法。
Quality control and the progress control are main methods of project management.
分析了当前工程管理软件在进度管理上的不足。
The defect of the traditional project management software in the progress management is analyzed.
由于近来的气候恶劣,工程进度推迟了几个星期。
Owing to the recent bad weather, the project is several weeks behind schedule.
财务部门根据合同约定及工程实际进度安排付款。
Financial department will arrange payment according to contract and actual progress.
工程中所采用的进度计划是风险可接受的方案。
工程的进度赶在计划之前了。
使用传统的手工管理难以适应工程进度的要求。
The traditional management method could not meet the requirements the project construction progress.
天气恶劣使工程进度受阻。
在保证工程质量的前提下,如何进行进度和成本管理是项目管理的关键。
On the basis of quality, how to carry out progress and cost management is the key of project management .
进度、成本和质量是工程项目管理的三大控制目标。
Time, cost and quality are the most important control objects of project management.
质量控制应与工程成本、施工进度有机结合。
Quality control should combine organically with the project cost and construction progress.
基础施工直接控制着主体工程的施工进度。
Piles foundation construction determines the progress of main projects.
这类项目的物料管理会直接影响项目成本和工程进度。
The management to these materials will affect directly project cost and process.
输变电工程项目管理的多重要素包括安全、质量、进度及成本。
Multiple elements of power transmission project management includes security, quality, schedule and cost.
目前,工程项目进度计划的编制多采用网络计划方法。
Project network technique is presently a frequently-used method to make project schedule plan.
由于基金削减工程进度严重受阻。
The development of the project was seriously impeded by a reduction in funds.
我的任务就是和工程师沟通关于项目的进度。
My mission is to communicate with engineers about project progress.
确定和控制产值、成本这两项工作都在工程的进度中。
Determining production and cost, and controlling both during the progress of the work.
工程管理软件P3可对工程进度的全过程进行动态跟踪和控制。
P3 is a project management software that can dynamically trace & control whole project progress.
同承包商,设计师和业主方进行每周的工程进度会议。
Conduct weekly progress meetings with the contractor, architect and owner.
工程建设进度控制对提高工程项目的经济效益有重要影响。
Schedule controlling has an important effect on increasing economical benefit of construction project.
工程建设项目的成本、进度与质量一起并称为建设项目管理的三大控制目标。
The cost, schedule and quality are the most important aim of control in the construction project.
工程建设项目的成本、进度与质量一起并称为建设项目管理的三大控制目标。
The cost, schedule and quality are the most important aim of control in the construction project.