他们索要工程进度报告。
由于基金削减工程进度严重受阻。
The development of the project was seriously impeded by a reduction in funds.
由于下雨,导致地铁的工程进度落后。
Because of rain, construction on the subway system fell behind schedule.
天气恶劣使工程进度受阻。
使用传统的手工管理难以适应工程进度的要求。
The traditional management method could not meet the requirements the project construction progress.
由于近来的气候恶劣,工程进度推迟了几个星期。
Owing to the recent bad weather, the project is several weeks behind schedule.
这类项目的物料管理会直接影响项目成本和工程进度。
The management to these materials will affect directly project cost and process.
同承包商,设计师和业主方进行每周的工程进度会议。
Conduct weekly progress meetings with the contractor, architect and owner.
工程管理软件P3可对工程进度的全过程进行动态跟踪和控制。
P3 is a project management software that can dynamically trace & control whole project progress.
甲方和设计师提供设计的进度表和工程进度以使艺术品顾问能够及时跟进。
Client/interior designer to provide design schedule and project programme to Art Consultant to follow.
甲方和设计师提供设计的进度表和工程进度以使艺术品顾问能够及时跟进。
Client/interior designer to provide design schedule and project programme to Art Consultant to follow.