这一工程带来的变化给我留下了深刻的印象。
I was deeply impressed with the changes brought about by the project.
图2:随时间变化的工程重点。
也许,来自消费者的压力能够促进事态的变化,保障装修工程的质量。
Maybe consumer pressure may help change this state of affairs and ensure quality is delivered.
工程师或设计者可以要求做一按比例变化的结构模型。
The engineer or designer may call for a scale model of the structure to be made .
只要压力一有大幅度变化就报告给主管工程师。
Any serious fluctuation in pressure should be reported at once to the engineer in charge.
只要压力一有大幅度变化就报告给主管工程师。
Any serious fluctuation in pressure should be reported at once to the engineer in charge.
应用推荐