您对舱盖工程完工单还有不同意见吗?
Do you have any different opinions to the finished work list of hatch cover project?
文章利用价值工程的方法,对单井平台的工艺流程进行了优化。
The process flow of a single well platform is optimized by using value engineering method.
备注:1。本单由厂务工程师或设备工程师提出申请。
Remark: 1. This form must be applied by the Facility or Equipment engineer.
若施工期间出现工程变更,则工程变更通知单要符合合同中的单价比率规定。
If there is a change order during the construction period, the change order shall adopt the unit rate price of the contract.
若施工期间出现工程变更,则工程变更通知单要符合合同中的单价比率规定。
If there is a change order during the construction period, the change order shall adopt the unit rate price of the contract.
应用推荐