每天作业完的吊篮应停在首层安全网以上位置。
The daily work hanging basket should stop above the first safety net the position.
设计注重站段位置,使到、发列车和调车作业交叉干扰较轻;
The attention was paid to the location of the station section in the design.
设计注重站段位置,使到、发列车和调车作业交叉干扰较轻;
The attention was paid to the location of the station section in the design.
应用推荐