The service provides two operations: the ability to respond to a production schedule request and the ability to create a shipping schedule.
服务提供了两种操作:响应一个产品日程请求的能力,以及创建传递日程安排的能力。
You can schedule most client operations, such as backup, to begin automatically.
您可以将备份等大部分客户机操作调度为自动开始。
The asynchronous, schedule-based, scaleable qualities of job-oriented management are well suited for performing periodic administrative operations from the central data center out to the branches.
面向作业管理的异步、基于计划、可伸缩的特性特别适合于从中央数据中心对分店执行定期管理操作。
You can use the dbcrons feature to schedule load and unload operations by calling stored procedures.
可以使用dbcrons特性,通过调用存储过程来调度加载和卸载操作。
The schedule and scheduleAtFixedRate methods are different because the timings of these operations are not guaranteed; operations such as garbage collection might cause a task to be executed late.
schedule和scheduleAtFixedRate方法是不同的方法,因为这些操作的计时无法保证;像垃圾搜集这样的操作可能会造成任务推迟执行。
The red arrow shows that the Developing Schedule Definition business use case from Figure 7 supports the business goal that is set by the Operations Manager.
红色箭头表明出自于图7的开发进度定义(Developing Schedule Definition)业务用例支持由运作管理人员设定的业务目标。
In order to maintain the project schedule it is important that the coring operations be carried out as efficiently and trouble free as possible.
为了维持项目时间表,高效地而且无故障地进行取岩心作业是很重要的。
The key to JIT operations is that the demand for components and materials depends on the finalized production schedule.
准时制作业的关键是对配件和物料的需求根据最终生产进度来决定。
The use of such a coding schedule, gene and parameters make the genetic operations quite simple.
采用这种编码方案、遗传算子和参数使得遗传操作大大简化,能达到有效的调度作用。
Thee key to JIT operations is that the demand for components and materials depends on the finalized production schedule.
准时制作业的关键是对配件和物料的需求根据最终生产进度来决定。
C51 program has been set the schedule of reading and writing status for controller. It can work out some operations of writing instruction code, writing data code, clear screen and roll screen.
用C51程序设置对于控制器的读、写状态的时序,从而实现对于控制器的写指令代码、写数据代码、清屏幕、屏幕滚动功能的操作。
Assist Operations Manager to schedule production.
协助生产总监处理生产排程事宜。
To develop and maintain the monthly work schedule in co operations with the sales Director to ensure the completion of sales targets.
和销售总监共同制定月度工作计划并保持及时沟通,从而确保完成销售指标。
As a CEO with operations that span across 12 time zones and a travel schedule that takes me across the globe each month, I rely heavily on technology to stay connected.
作为CEO,我管理的业务遍布12个时区,每个月都要去很多国家出差。所以我非常依赖能与人保持联系的高科技。
As a CEO with operations that span across 12 time zones and a travel schedule that takes me across the globe each month, I rely heavily on technology to stay connected.
作为CEO,我管理的业务遍布12个时区,每个月都要去很多国家出差。所以我非常依赖能与人保持联系的高科技。
应用推荐