The method need small operation site and does not affect the operation of railways with fast concretion speed and well treatment effect.
此方法占地少、不影响运营,地基固结速度快,地基处理效果好。
This paper reveals that the problem for division of labor of yards in a railway hub can be decomposed as two levels, which are operation site choice and route choice in the hub.
揭示了铁路枢纽编组站分工问题可以分解为车流在枢纽内作业地点的选择和走行径路的选择两个层次。
This paper reveals that the problem for division of labor of yards in a railway hub can be decomposed as two levels, which are operation site choice and route choice in the hub.
揭示了铁路枢纽编组站分工问题可以分解为车流在枢纽内作业地点的选择和走行径路的选择两个层次。
应用推荐