To organize the feasibility study of construction projects;
组织建设项目的可行性研究;
The Planning Section is in charge of the administration of construction projects.
规划科负责建筑工程的管理工作。
Risk management has been a key factor to influence the success of construction projects .
风险管理已成为影响工程项目成功与否的关键因素之一。
Rework can have adverse effects on the performance and productivity of construction projects.
返工对于建设项目的绩效和生产率是十分有害的。
Therefore, the cost of construction projects is the core of the construction project management.
因此,施工项目成本是施工项目管理的核心。
The management of controlling factors will directly affect the overall quality of construction projects.
对于控制因素的管理,将直接影响到建筑工程的总体质量。
Improve the quality of construction projects, we need to strengthen the construction project management.
提高建筑工程质量,需要加强建筑工程管理工作。
We will strengthen the management of construction projects, and will properly arrange capital schedules.
加强基建项目管理,合理安排资金进度。
Human resource management in construction projects is an important component of construction projects management.
建设项目人力资源管理是建设项目管理的重要组成部分。
Green risk assessment model of construction projects is conceived based on the above environmental impact indicators.
根据以上环境影响评价指标构建了建设项目绿色风险评价模型。
Estimation of the investment of a construction project is an important task in the management of construction projects.
工程投资额预测是市政工程管理中的一项重要工作。
Concrete Template construction is an important part of a direct impact on the quality and cost of construction projects.
模板工程是混凝土结构工程施工的重要部分,直接影响到工程建设项目的质量和成本。
For a long term, in China, cost management of construction projects was concentrated on the cost budget and static control.
长期以来,我国对项目成本管理的认识基本上还停留在工程项目成本确定和静态控制上。
Abstract: the cost control of construction projects is an all-around job related to every aspect of the construction production.
[摘要]施工项目成本控制是涉及施工生产各方面的综合性工作。
No units or individuals may designate any institution to evaluate for a construction unit the environmental effects of construction projects.
任何单位和个人不得为建设单位指定对其建设项目进行环境影响评价的机构。
The efficiency and benefit of information management and the exchange of construction projects have been influencing project management greatly.
建设项目信息管理与信息交流的效率和效益对项目管理的成败有极大影响。
The management of construction projects require knowledge of modern management as well as an understanding of the design and construction process.
建筑项目管理需要现代管理知识,同时要对设计和实施过程有所理解。
It is proved by example that it is convenient and feasible to use the improved analytical hierarchy process in evaluating risk of construction projects.
经项目风险评价的实例验证,用改进的层次分析法对工程项目风险进行评价,是简便可行的。
This paper analyzed the measures to strengthen the construction management based on the existing problems in the current management of construction projects.
本文就目前我国建筑工程管理中存在的一些问题,探析加强建筑工程管理工作的措施。
Article 15 Wholly foreign-owned construction enterprises may only undertake the following types of construction projects within the scope of their qualifications.
第十五条外资建筑业企业只允许在其资质等级许可的范围内承包下列工程。
Abstract: : the control and management of the cost of construction of municipal infrastructure projects throughout the whole process of construction projects.
摘要:市政基础设施项目建设工程造价的控制与管理贯穿于工程建设的全过程。
We will intensify the oversight of the use of materials and funds for disaster relief and post-quake reconstruction and ensure the quality of construction projects.
要加强对抗震救灾和灾后恢复重建资金、物资的监管,确保工程建设质量。
With the vigorous development of construction projects in China, the piled raft foundation has been widely used in high-rise buildings and ultra-high buildings.
随着我国建筑工程的蓬勃发展,桩筏基础已广泛应用于高层及超高层建筑中。
The theoretical construction and implementation of the after-assessment of construction projects is a new and developing systematic project in engineering management.
建设项目后评估的理论建设与实施,是工程管理科学领域中一项新兴的系统工程科学。
Economic evaluation in the feasibility study of construction projects involves hard and complex work of data processing and computation, especially in joint ventures.
在建设项目可行性研究的经济评价中,敏感性分析的数据处理和计算工作量相当繁重,而中外合资项目尤为复杂。
Economic evaluation in the feasibility study of construction projects involves hard and complex work of data processing and computation, especially in joint ventures.
在建设项目可行性研究的经济评价中,敏感性分析的数据处理和计算工作量相当繁重,而中外合资项目尤为复杂。
应用推荐