• These results suggest that keratin filaments may play an important role in nuclear assembly in Xenopus egg extracts which is not reported before.

    这些结果显示角蛋白纤维在核膜重新形成的过程中起到重要的作用。

    youdao

  • Then it was Japan’s earthquake, tsunami and nuclear disaster which crimped the supply of parts to car assembly plants in America.

    然后是日本的地震、台风,还有影响供应美国汽车组装工厂配件的核灾难。

    youdao

  • Then it was Japan's earthquake, tsunami and nuclear disaster which crimped the supply of parts to car assembly plants in America.

    之后又推脱给了创伤美国汽车装配工厂零件供给的日本的地震、海啸以及核泄漏事故。

    youdao

  • FITLINK is one of main programs of NDFMPS that is core nuclear design and fuel management program system, and is a treatment program of cross section parameter of fuel assembly.

    FITLINK是NDFMPS堆芯核设计和燃料管理程序系统的主要程序之一,是一个组件截面参数处理程序。

    youdao

  • Since its adoption 20 years ago by the General Assembly, the Comprehensive Nuclear-Test-Ban Treatyhas yet to enter into force.

    自大会20年前通过《全面禁止核试验条约》以来,该条约一直没有生效。

    youdao

  • This paper expounds the assembly of integral-shrouded blade and free standing blade for 650mw nuclear turbine.

    对650MW核电汽轮机自带围带叶片及自由叶片装配工艺过程进行详细论述。

    youdao

  • The features of nuclear power steam turbine in such aspects as design, manufacture, use of material, assembly, operation, maintenance etc. are introduced.

    介绍核电汽轮机在设计、制造、材料使用、安装、运行、维护等方面特点,及其与常规火电汽轮机的区别。

    youdao

  • The experiment research has been done on the uranium solution nuclear critical safety experiment assembly.

    在铀溶液核临界装置上进行了实验研究。

    youdao

  • As for the nuclear power safety, a variety of non-destructive testing on the production of nuclear fuel assembly is required during the manufacturing operation in NPIC.

    该单位生产的核燃料组件在制造过程中必须经过多种无损检测,其中在焊接工艺之后进行外形综合尺寸的检测就是重要部分。

    youdao

  • The drop-time of control assembly is one of the most important parameters to ensure safe operation of Nuclear Power Plant.

    控制棒落棒时间是保证核电站安全运行的重要参数之一。

    youdao

  • The reload strategy is from 12 months to 18 month of GNPS, the fuel assembly changed from AFA 2g to AFA 3g and core nuclear data been changed, thus many accidents need to be reanalyzed.

    大亚湾核电站由年换料改为18个月换料,燃料组件由AF A2g改为afa3g,堆芯中子学参数发生了较大变化。因此,需要对许多事故重新进行分析。

    youdao

  • The reload strategy is from 12 months to 18 month of GNPS, the fuel assembly changed from AFA 2g to AFA 3g and core nuclear data been changed, thus many accidents need to be reanalyzed.

    大亚湾核电站由年换料改为18个月换料,燃料组件由AF A2g改为afa3g,堆芯中子学参数发生了较大变化。因此,需要对许多事故重新进行分析。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定