• This paper discusses an optimization method to determine the minimum cost scheduling in network schedule by means of fuzzy linear programming.

    本文提出用模糊线性规划求解网络计划最低费用日程的优化方法。

    youdao

  • This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.

    提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。

    youdao

  • Project network technique is presently a frequently-used method to make project schedule plan.

    目前,工程项目进度计划的编制多采用网络计划方法。

    youdao

  • Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.

    作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。

    youdao

  • Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.

    作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。