• The moving time was shortest in autumn season, around 6% of the full day.

    运动时间以秋季为最短,占昼夜时间的6%左右。

    youdao

  • The span of time, including order preparation time, queue time, processing time, moving time, and receiving and inspection time, is called lead time.

    这个时间周期包括订单准备、等待、处理、传输以及接收时间,这个时间段称作前置时间。

    youdao

  • The mathematical models which calculate the distance of throwing steel and the moving time of brake plate in the process of cooling bed were given in this paper.

    介绍了棒材上冷床过程中抛钢距离及裙板动作时间公式的推导与生产实际的验证。

    youdao

  • The reliability of moving time parameter was calculated about the launching equipment cap opening. The calculation result shows that the time parameter reliability is very high.

    并具体计算了该发射装置顶盖开启运动时间参数的可靠度。由计算结果可知,时间参数具有很高的可靠度。

    youdao

  • The reliability of moving time parameter was calculated about the launching equipment cap opening. The calculation result shows that the time parameter reliability is very high.

    并具体计算了该发射装置顶盖开启运动时间参数的可靠度。由计算结果可知,时间参数具有很高的可靠度。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定