• Create a model project.

    创建一个模型项目

    youdao

  • Click OK to check out the model project.

    点击OK模型项目

    youdao

  • Create a model project, and add a model inside of that project.

    创建模型项目添加项目一个模型。

    youdao

  • Notice that there is new file in the Model Project called changes_log.xml.

    注意Model Project一个叫做 changes_log.xml 的文件

    youdao

  • Create a new business model project with the attributes as shown in Figure 1 below.

    如下1属性新建业务模型项目

    youdao

  • Open the plugin.xml file of the model project (org.example.mysql) and click the Extensions TAB.

    打开模型项目plugin . xml文件(or g .example . mysql)点击Extensions项。

    youdao

  • For this exercise, use the existing UML model project to store the transformation configuration file.

    练习中使用已有UML模型项目保存转换配置文件

    youdao

  • A green rectangle icon overlay, as illustrated in Figure 7, indicates that the model project is under source control.

    一个绿色矩形图标会覆盖如图7所示,它显示模型项目置于源代码控制之下。

    youdao

  • Typically, you will want to separate the model project from the project that contains the self-tracking entity types.

    通常需要模型项目包含跟踪实体类型项目分开

    youdao

  • Every client as enterprise's advertising media, every project as his model project and has won the customer and market.

    每个客户当成企业广告传媒一项工程当作自己样板工程赢得客户市场

    youdao

  • Before you start to implement a custom validator, look at the architecture for how validators are defined in the model project.

    开始实施一个定制确认器之前,您可以先查看一下在模型项目之中如何定义结构的。

    youdao

  • Finally, the article analyzes and explains the serious consequence owing to neglecting 'pile cap effect' through the model project accident.

    最后通过典型工程事故分析说明忽视效应”所引发的严重后果

    youdao

  • Use the Source Directory panel as shown in Figure 12 above, to select the list of model project to be used for mapping the subunit being imported.

    使用上面12SourceDirectory 页面,选择用于映射导入单元模型项目

    youdao

  • Assuming that we do not already have a suitable project, we will create one and a new business process model within it using the model project wizard.

    假设我们目前尚无适当项目,则我们需要创建个,其中使用Model Project向导来创建业务流程模型

    youdao

  • Based on the design of Nanning Hubin Mansion-scientific model project in 2004, the application of steel-concrete hybrid structure technology is introduced in high-rise residential buildings.

    结合建设部2004年科技示范工程南宁湖滨大厦设计介绍钢-混凝土混合结构技术高层住宅中的应用

    youdao

  • With the design of Nanning Hubin Mansion-scientific model project in 2004, the application of steel-concrete hybrid structure technology in high-rise residential buildings is mainly introduced.

    结合建设部2004年科技示范工程-南宁湖滨大厦设计,介绍-混凝土混合结构技术高层住宅的应用

    youdao

  • A proposed joint project would develop a prototype or demonstration model for the "21st-century national information infrastructure".

    一项拟议中的联合项目开发用于21世纪国家信息基础设施”的原型示范模型

    youdao

  • Create a simple test model and project to test the aspect.

    创建一个简单测试模型项目测试方面

    youdao

  • It then builds a comprehensive metadata model of your project.

    然后项目构建一个全面元数据模型

    youdao

  • New project: Provide the new project name if you want to import the model into new modeling project.

    工程如果要将模型导入新的建模工程中,那么就提供新的工程名称

    youdao

  • This constitutes one common type of community model for a software project team.

    实际上就形成了软件项目团队常见社区模型

    youdao

  • With a reuse engineering model it occurs one project at a time.

    对于重用工程模型项目要进行域分析。

    youdao

  • You have now defined the appropriate metadata (or data model) for this project.

    我们已经为此项目定义适当的元数据(数据模型)。

    youdao

  • The three supported scopes are workspace, project, or model.

    三个支持范围工作区项目或者模型。

    youdao

  • Model governance policies need to be applied at model layer boundaries, for example, between the enterprise and project model streams.

    模型管理政策需要模型应用例如,在企业项目模型之间应用。

    youdao

  • Export WID Module: the business analyst exports the model into WID project interchange.

    导出WID模型业务分析师模型导出WID项目交换文件中。

    youdao

  • Architects can tailor the guidance model to create an initial decision model for a project.

    架构指导模型裁剪创建针对某一项目的决策模型雏形。

    youdao

  • The schema model in the project structure will look like the following screen capture.

    项目结构模式模型如下面的屏幕截图所示。

    youdao

  • Project model changes may not have been accepted into the enterprise model.

    企业模型可能并不接受项目模型变更

    youdao

  • Project model changes may not have been accepted into the enterprise model.

    企业模型可能并不接受项目模型变更

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定