• The MRP group is assigned to the material in the material master record.

    在物料主数据中分配MRP组到物料。

    youdao

  • In this process, you display the material master record and a quota arrangement.

    在这个过程中,你显示物料的主记录和配额协议。

    youdao

  • Assign the MRP groups to every material to be planned in the material master record.

    在物料主数据中,把这个MRP组分配给每一个要计划的物料。

    youdao

  • In this case, the MRP group is assigned to the material in the material master record.

    在这种情况下MRP组在物料主数据中被分配给物料。

    youdao

  • If you have not activated cross-company costing, the system uses a price from the material master record.

    如果你眉宇激活跨公司成本核算,系统用物料记录中的价格。

    youdao

  • You must maintain the consumption mode in the Material Master Record (MRP) screen or in Customizing for Demand Management.

    你需要在物料主记录的MR P视图中维护物料的消耗模式,或在需求管理的后台定制中维护。

    youdao

  • Stock fallen below safety stock level Available plant stock is less than the safety stock recorded in the material master record.

    可用库存已低于物料主数据中指定的安全库存量。

    youdao

  • However, the production start date calculated using the routing lies before the order start date calculated using the in-house processing time in the material master record.

    然而,通过工艺路线中设置的加工时间计算出来的生产开始日期位于通过在物料主数据中设置的产内加工计算出来的工单开始日期之前。

    youdao

  • 64:The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.

    通过工艺路线中设置的加工时间计算出来的生产完成时间位于通过物料主数据中维护的产内加工时间计算出来的工单完成日期之后,这条例外信息就会产生。

    youdao

  • If you have entered a strategy group or an MRP group containing the appropriate strategies in the material master record, you do not have to enter a requirements type in Demand Management.

    如果在物料主数据中你已经输入了一个包含正确策略的策略组或MRP组,你就不需要再在需求管理中输入需求类型了。

    youdao

  • There is a field in the master record that indicates whether a quota arrangement applies to the relevant material.

    物料主数据中有一个字段来决定是否有相关物料的配额协议需要分配。

    youdao

  • There is a field in the master record that indicates whether a quota arrangement applies to the relevant material.

    物料主数据中有一个字段来决定是否有相关物料的配额协议需要分配。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定