• The workers drove out a long tunnel.

    工人一条长长的隧道

    youdao

  • The train went through a long tunnel.

    火车穿过长长的隧道

    youdao

  • At first it was a long tunnel but then Alice began falling down and down.

    这个兔子洞起先一条长长的隧道接着爱丽丝不停地向下滑落。

    youdao

  • Completed in 1994, theprice tag of this 31-mile-long tunnel exceeded $20 billion.

    1994年竣工条31英里长的隧道号称造价超过200亿美元。

    youdao

  • Probably now, if he tried, he could get through that long tunnel, but he was not going to try yet.

    如果一试,也许现在游过那条长长的隧洞但是不想试试。

    youdao

  • The 3600m-long tunnel has 4 lanes. Its average daily traffic flow is expected to reach 50000 vehicles.

    武汉长江隧道全长3.6公里,双线4车道预计日通行能力为5万

    youdao

  • Conclusion the occupational hazards of the railroad long tunnel on workers might be of chronic in nature.

    结论铁路隧道作业人员危害表现为慢性职业危害。

    youdao

  • Background: a nearly 3-mile-long bridge dips into this6-mile-long tunnel in a region prone to earthquakes.

    背景材料:地震易发区3英里长的钻入6英里长的隧道

    youdao

  • The 1200 meter long tunnel is about 5 meters high and 4 meters wide. It is located in the Henan Province of China.

    隧道120054位于河南省

    youdao

  • Duber Khwar Hydropower Project is a diversion type power station characterized by high water head and long tunnel.

    巴基斯坦杜伯华水电站工程水头隧洞、引水水电站工程。

    youdao

  • Design code and key technical points for main tunnel and parallel heading of East Qinling Super-long Tunnel are introduced.

    介绍秦岭特长隧道工程平行导坑的设计标准、施工技术要点

    youdao

  • Elastic monolithic track bed was used for East Qinling Super-long Tunnel for its good elasticity, less maintenance and low cost.

    新建铁路秦岭特长隧道采用弹性整体道床轨道基础,基础弹性减少了线路维修工作量降低费用。

    youdao

  • The paper expounds the measures for lowering the temperature in tunnel during the construction of the Qinling extra long tunnel.

    本文主要论述秦岭特长隧道施工降温措施我国以后修建长大隧道中的施工降温问题提供了经验。

    youdao

  • Studying the long tunnel geometric design from its actual operation is the issue should be paid close attention in railway design.

    运行角度对长大隧道设计进行专题分析铁路设计工作需要重点关注课题

    youdao

  • The diversion tunnels of the Shuibuya Project feature high head, big discharge, long tunnel line and complicated geologic conditions.

    水布垭导流隧洞具有水头流量线地质环境差等特点,因而技术问题较多,难度较大。

    youdao

  • Deep and long Tunnel engineering Geology macro forecast is still urgent to solve as a major topic research in the engineering world today.

    长大隧道工程地质宏观预测仍然当今世界各国工程界亟待解决重大科研课题。

    youdao

  • Chihiro in mom and dad went out to a new home path in the woods, father of car accident to an ancient tower, tower following a long tunnel.

    千寻爸爸妈妈郊外新家林中小路上,爸爸意外开到了一个古老城楼前,城楼下面长长的隧道。

    youdao

  • At Jiaozuo, giant drills have already gouged out more than half of the 2.5 mile-long tunnel that will take the water under the Yellow river.

    焦作条4100米长的水渠已经巨大钻孔机凿开一半,它黄河之下流过。

    youdao

  • The trainscould make it through the 6.5-mile-long tunnel in less than half anhour, stopping at nine different sorting stations along the way.

    列车可以不到一个半小时时间内驶过6.5英里长的隧道九个不同分拣沿途停车

    youdao

  • Resting on the Jumeirah Beach, an automatic train will carry guests from dry land through a 515-meter long tunnel underwater into the hotel lobby.

    游客可以Jumeirah沙滩上乘坐自动列车穿过515长的水下通道来到酒店大堂

    youdao

  • I know what it's like to go through the long tunnel of grief and back into the sunlight of hope and life. Perhaps now I can help others do the same.

    知道走过哀伤漫长重见希望生命之光的滋味如何,或许,我现在可以帮助别人这样做

    youdao

  • The 2.2 mile long tunnel crossing Antwerp in Belgium is fitted with 16, 000 solar panels covering 50, 000 square metres, roughly eight football pitches.

    这座2.2英里的隧道途径比利时安特卫普省,全程装配1.6万个太阳能电池板,电池板总面积达5万平方米相当于8个足球场。

    youdao

  • Once deep-buried long tunnel is constructed in soft rock under high crustal stress, rheology of soft rock is an outstanding engineering geology problem.

    地应力环境软弱修建深埋隧道软弱围岩流变是个突出工程地质问题

    youdao

  • The measurements of ground stresses by using the hydraulic cracking method within the deep boreholes were proceeded at the Qinling extra long tunnel district.

    秦岭特长隧道地区采用水压致裂进行钻孔应力测量

    youdao

  • The results show that the ground stresses at Qinling extra long tunnel district have been expressed in some specialities mainly by the gravitational stress field.

    结果表明秦岭特长隧道地区地应力表现重力应力场为主某些特征

    youdao

  • The results show that the ground stresses at Qinling extra long tunnel district have been expressed in some specialities mainly by the gravitational stress field.

    结果表明秦岭特长隧道地区地应力表现重力应力场为主某些特征

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定