The reinforced concrete face-slab is adopted as impervious body by Long Tan RCC Dam.
龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗体。
The paper discusses the excellent condition of damming, advanced technical economic index, great economic and social benefit of Long Tan Hydropower Station.
论述了龙滩水电站优越的建坝条件、先进的技术经济指标、巨大的经济效益和社会效益。
Due to the very complex geological condition on the right bank of Long-tan hydropower station, the side slope has been treated with anchored-tunnel in order to get its stability.
龙滩水电站右岸岸坡地质条件异常复杂,采用锚固洞塞的加固方案对边坡稳定进行治理。
Due to the very complex geological condition on the right bank of Long-tan hydropower station, the side slope has been treated with anchored-tunnel in order to get its stability.
龙滩水电站右岸岸坡地质条件异常复杂,采用锚固洞塞的加固方案对边坡稳定进行治理。