While datapools are the easiest way to link test data with your tests in Rational Performance Tester, they can become inefficient with very large sizes (in general over 10,000 records).
虽然数据池是RationalPerformance Tester中连接测试数据和测试最简单的方法,但是它们不能有效地处理大规模的数据(通常会超过10,000个记录)。
This is the most reliable link test solution for OBSAI interconnects.
这对于OBSAI互连器来说是一个非常可靠的链接解决方案。
You can link test cases to existing requirements that have been created in your team project.
可以将测试用例链接到团队项目中已创建的现有要求。
When there are not data being transmitted on the channel, both sides shall send link test packets every time interval C to maintain the connection.
当信道上没有数据传输时,通信双方应每隔时间C发送链路检测包以维持此连接。
Link Test tool and signal strength LED display ease the trouble in site installation and debugging.
链接测试工具和信号强度LED显示屏缓和现场安装和调试的麻烦。
Operation of a Link Test. The operation is only used to maintain a long connection between two communication parties.
链路检测操作。本操作仅适用于通信双方采用长连接通信方式时用于保持连接。
Operation of a Link Test. The operation is only used to maintain a long connection between two communication parties.
链路检测操作。本操作仅适用于通信双方采用长连接通信方式时用于保持连接。
应用推荐