During the measurement of welding contraction distortion for stator in a large hydropower station, the method is used well.
在对某大型水电站焊接收缩变形测量中,该方法得到了很好的应用。
The main objects, items and implementation solution of on-line monitoring combined with its practical application for large hydropower station are fully described.
结合在线监测技术的应用实践,较全面地描述大型水电厂在线监测的主要对象、监测项目和具体的实施方案。
In tailrace tunnels of large hydropower station, a transient mixed free-surface-pressure flow may occur, which has a complex effect on the stability and transient of the power plant.
大型水电工程的尾水隧洞中可能会发生明满交替流动,给电站过渡过程带来很大影响,需要建立合理可行的明满交替流动数值计算模型。
This thesis analysis the whole construction of the large hydropower station, and establish risk assessment models, and then use the improved fuzzy synthetic discrimination to determine the weight.
本文通过对大型水电站建设进行全面分析,建立水电站建设工期风险评价模型,运用改进的模糊综合评价方法对其进行风险评价。
As the high head, high velocity and large flow of flood discharge, the concrete of spillway tunnel in Xiaowan Hydropower Station is easy to be damaged by cavitation.
小湾水电站泄洪洞在泄洪时具有高水头、高流速、泄量大的特点,对混凝土冲刷力强,容易产生空蚀破坏。
The construction of Nuozhadu Hydropower Station is large in construction scale with many environment impact factors and wide involving aspect.
糯扎渡水电站建设规模大,环境影响因素多且涉及面广。
The dam site valley of Hongjiadu Hydropower Station is narrow, amplitude variation of water level and discharge at it are large.
乌江洪家渡水电站坝址河床狭窄、水位流量变幅大。
By means of test research, a small sized inlet with a symmetrical bell-mouth form instead of traditional large sized one will be adopted for the TGP's hydropower station.
为了优化三峡电站进水口体形,试验研究采用了与传统大进水口不同的小进水口体形方式,并将进水口的喇叭口段布置成对称状。
Laxiwa hydropower Station is a large scale hydropower engineering on the Yellow River.
拉西瓦水电站是黄河流域特大型水电工程。
A large number of experiment studies are performed for basalt crushed aggregate alkali activity by different test methods at site of Xiluodu hydropower station.
用多种检测方法对溪洛渡水电站当地的玄武岩人工骨料的碱活性进行了大量的试验研究。
Prestressed pier of hydropower station service radial gate features large aperture dimension, high water thrust and so on.
水电站工作弧门预应力闸墩具有孔口尺寸大、水推力大等特点。
Unit foundation of powerhouse of large scale hydropower station need bear very heavy dynamic load, generally used cylinder form, the foundation with non cylinder form has not been applied in home.
大型水电站厂房的机墩结构要承受巨大的动力荷载,通常采用圆筒式机墩,非圆筒型机墩在国内尚无应用。
In water conservancy and hydropower projects ot plain, the large quantities of small power station of low water head and large discharge have been built in our country.
在平原地区水利水电工程中,我国建造了一大批低水头、大流量的小型水电站。
The Shapotou Control Project is the first power station where large through flow type turbine generator units were installed among the hydropower station at middle reaches of the Yellow River.
黄河沙坡头水利枢纽的水轮机是黄河中游径流水电站中第一个采用大型灯泡式水轮机。
With the development of large scale hydropower station and the increase of installed capacity of generating unit, the evaporation cooling has been applied widely.
随着大型水电站的开发建设和单机容量的增大,蒸发冷却将得到广泛的应用。
Gantry crane is the indispensable one of the large-scale equipments in hydropower station, the gantry cranes which are used in hydropower to open and close sluice gates are named gantry hoists.
门式起重机是水利水电工程中不可缺少的大型设备之一,在水电站用于开启和关闭闸门的门式起重机称为门式启闭机。
Longtan hydropower station is large in big structure size of spiral case, high in installation accuracy and welding requirement, poor in welding environment, and short in construction period.
龙滩水电站机组蜗壳结构尺寸大,安装精度和焊接要求高,焊接环境差,工期要求短。
The chaos optimal algorithm is applied to solve the optimal dispatch model for large scaled complicatedly connected hydropower station groups.
在建立混联水电站群长期优化调度模型的基础上,应用混沌优化算法对模型进行求解。
Using these methods, a diversion tunnel of a large-scale hydropower station was analyzed to study the stress distribution, the peculiarity and process of failure.
结合一个水电站导流洞工程,分析了构造应力对导流洞围岩的应力分布、破坏特征和破坏过程的影响。
Xiluodu hydropower station is a proposed large scale key water control project located on the mainstream of Jinshajiang river, second only to the Three Gorges project.
溪洛渡水电站是金沙江干流上拟建的一座仅次于三峡的大型水利枢纽,电站坝址区水文地质条件复杂。
Using these methods, the stabilization of the diversion of a large-scale hydropower station was analyzed. According to the result, the designer could make a more rational tunnel structure.
采用此方法对一大型水电站的左、右岸导流洞围岩稳定进行计算和分析,为洞室结构设计提供有效的数值参考。
The results of this paper present theoretical basis for designing, construction and running of a downriver large-scale hydropower station.
研究结果为下游某大型水电站的设计、施工与安全运营提供了理论依据。
The results of this paper present theoretical basis for designing, construction and running of a downriver large-scale hydropower station.
研究结果为下游某大型水电站的设计、施工与安全运营提供了理论依据。
应用推荐