Having international engineering company work experience is preferred.
有国际工程公司工作经验者优先。
Strategy and method for the international engineering bids are put forward.
第四、提出了国际土木工程投标策略、方法以及报价模型。
The risk of contract for international engineering in signing stage is analyzed.
针对国际工程承包合同签订阶段的风险进行分析。
Contract management plays a central role in international engineering project management.
合同管理是国际工程项目管理的核心内容。
Durability of concrete is an important subject respected by international engineering circle.
混凝土耐久性是国际工程界关注的重大课题。
The opportunity of international engineering contractors after Chinas entry into WTO will increase.
我国加入WTO给国际工程承包企业带来了更多的机遇。
The durability of concrete is an important research subject in the international engineering industry.
混凝土耐久性是国际工程界的重要研究课题。
The cost of procurement is more than 70%, and some of them about 80% of total cost of international engineering.
我国参与国际工程项目市场竞争的企业采购占成本的比例在70%以上,甚至者可达80%。
Wall concrete crack phenomenon is a widespread and long-term studying problem in international engineering field.
地下室墙体混凝土裂缝现象十分普遍,是国内外工程界长期研究的课题。
It is necessary to widespread and adopting valuate mode of engineering list in consonance with international engineering.
为了实现与国际接轨就必须推广采用工程量清单计价模式。
In the first part, the convention, procedure and characteristics of the international engineering are systematic dissertated.
第一部分系统论述了国际工程投标的惯例、程序及特点。
FIDIC league constitutes and promulgates many files of criterion, which are applied in international engineering project area.
FIDIC联合会制定和颁布了许多规范性文件,被广泛应用于国际工程中。
Correspondent: When Percy Barnevik became head of the international engineering group ABB, his task was to make globalization work.
记者:佩尔西·巴列维掌管国际工程集团后,他的任务就是推进公司的全球化。
Abstract: international engineering corporation has to improve their management degree to cope with the fierce international competition.
[摘要]激烈的国际竞争要求国际工程承包企业要向管理要效益。
The third part, is systematic dissertated the core problem about tendering for international engineering-compose and calculation ofquotation.
第三部分对国际工程投标中核心问题——报价的组成与计算进行了系统全面地论述。
In our country, knowing and understanding earned value management begins with the cooperation with international engineering company of the 1990s.
在我国,对挣值管理的认识和了解开始于90年代与国际工程公司的合作。
Abstract: Recently, the international engineering corporations have gradually become a major player in the field of process technology transferring.
[摘要]近年来,国际工程公司逐步成为主流工艺技术的主要掌握者。
Not only can contract claim enhance the ability of contractors to manage international engineering, but also can bring considerable financial benefit.
做好合同内索赔不但能提高承包商对国际工程施工管理的能力,而且能够给建筑商带来可观的经济效益。
In the aspect of operation mode, the article anatomy the importance of creating international engineering corporation and actualize "dumbbell strategy".
在经营模式上,剖析了工程咨询企业创建国际工程公司并实施“哑铃战略”的重要性;
This paper discusses about how Chinese contractors face the challenge and opportunity of international engineering contractors after Chinas entry into WTO.
本文就我国国际工程承包企业如何面对加入WTO带来的机遇和挑战,如何大力发展我国国际工程承包事业进行了探讨。
China Triumph International Engineering Co., Ltd. is an enterprise of science and technology with a history of more than 50 years and solid technical strength.
中国建材国际工程集团有限公司是具有五十多年历史和雄厚技术实力的科技型企业。
Admittedly, Chinese engineering contracting enterprises have been also exposed many problems in the cruel international engineering market competition meanwhile.
勿需讳言,在激烈的国际承包市场竞争中,我国的工程承包企业也暴露出了很多的问题。
Also, cases in practice validate the feasibility that FIDIC conditions integrate with the model of project contract management in International Engineering project.
通过实际案例验证了FIDIC合同条件与项目合同管理模块在国际工程承包项目中相互结合应用是具有可行性的。
The project management of the gross contracts for engineering is the practicing way which is organized by the current international engineering building project at present.
工程总承包的项目管理,是目前国际通行的工程建设项目组织的实施方式。
Jiangsu control-best engineering co, Ltd was founded in 1993 with its headquarters being in Canada. Control-Best specializes in international engineering project tendering.
创博国际控股有限公司创建于1993年,是一家总部设在加拿大的以承包国际工程项目为主的跨国私营企业集团。
As an important measure against the engineering project risk, the engineering project insurance system is an indispensable component in international engineering project operations.
工程保险制度作为防范工程风除的重要手段之一,已经成为发达国家以及国际工程承包市场不可或缺的一项制度。
This paper probes into the target of the contract management in tender stage of international engineering, the main content of which is how to win the bid and how to sign the contract.
就国际工程投标阶段承包合同管理的目标进行了探讨,其主要内容是如何争取中标和怎样商签承包合同。
This paper introduces the main contents, the major businesses' procedures and the implementation of the main works of the contract management of the international engineering projects.
介绍了国际工程项目合同管理的主要内容、主要业务程序进度和主要工作的实施。
This paper introduces the main contents, the major businesses' procedures and the implementation of the main works of the contract management of the international engineering projects.
介绍了国际工程项目合同管理的主要内容、主要业务程序进度和主要工作的实施。
应用推荐