Since the midst motor coach of Shanghai URT Line 1 Expansion Project has to be transported by railway, its necessary to design an interface box as the substitute of A-car.
上海轨道交通1号线扩编项目的中间动车需要由铁路运输完成,因此需要设计运输接口箱以代替A车功能。
With this interface box, computerized process control technique may be easily introduced in the conventional apparatus at industrial site without reformation too much.
可对工业现场常规装置不作太大改造就引入计算机的过程控制技术,实现机电一体化的初步目标。
With this interface box, computerized process control technique may be easily introduced in the conventional apparatus at industrial site without reformation too much.
可对工业现场常规装置不作太大改造就引入计算机的过程控制技术,实现机电一体化的初步目标。
应用推荐