• Based on the establishment of outsourcing provider evaluation index system, the outsourcer selection problem using ELECTRE-I method is solved.

    文章在建立外包商评价指标体系的基础上,利用ELECTRE - I方法求解外包商选择问题。

    youdao

  • This paper analyzes the main factor of affecting the measurement in high resistance measurement with V/I method, designs a high resistance measurement instrument based on microprocessor control.

    本文分析了影响V/I法高阻测量精度的主要因素,设计了以单片机为核心的高阻测量仪。

    youdao

  • This paper analyzes the main factor of affecting the measurement in high resistance measurement with V/I method, designs a high resistance measurement instrument based on microprocessor control.

    本文分析了影响V/I法高阻测量精度的主要因素,设计了以单片机为核心的高阻测量仪。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定