The seepage of Huojia reservoir main dam was seriously and influenced the dam safety.
火甲水库主坝渗漏,严重危及大坝安全。
The restoration paths include 5 paths at Huojia Station of Henan Network, 5 paths at Fangshan Station of Jing Jin Tang Network and Niangziguan Power Plant path respectively.
恢复路径分别为河南获嘉侧5条路径,华北京津唐电网房山侧5条路径与娘子关电厂侧恢复路径。
The restoration paths include 5 paths at Huojia Station of Henan Network, 5 paths at Fangshan Station of Jing Jin Tang Network and Niangziguan Power Plant path respectively.
恢复路径分别为河南获嘉侧5条路径,华北京津唐电网房山侧5条路径与娘子关电厂侧恢复路径。
应用推荐