• Taking Fen river as a case study, a management information system is set to implement pollution gross control and license management.

    以汾河治理为例,建立一个河流水污染物总量控制与排污许可证管理的信息系统。

    youdao

  • During transition from target gross control to capacity gross control, the total existing pollution loading often exceeds the environmental capacity in the region.

    在由目标总量控制向容量总量控制的过渡时期,现有排污量往往超过区域的环境容量。

    youdao

  • Under these principles, state-reserved water right, irrigation water right, water right allocation and gross control, water norm management, and water permission system have been considered.

    在这些原则下,考虑国家预留水权、农业水权,以及水权分配与总量控制、定额管理、取水许可等。

    youdao

  • Based on the consideration of gross control of pollutant emission, the paper discussed the trade of pollutants emission permits and its effects on environmental evaluation in feasibility study.

    从污染的总量控制出发探讨了进行污染物排污权交易的现实性和可行性以及对可行性研究中环境评价的影响。

    youdao

  • Based on the consideration of gross control of pollutant emission, the paper discussed the trade of pollutants emission permits and its effects on environmental evaluation in feasibility study.

    从污染的总量控制出发探讨了进行污染物排污权交易的现实性和可行性以及对可行性研究中环境评价的影响。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定