The second alternative is governance control points.
第二种方法是治理控制点。
Again, this should be a part of the enterprise level governance control board.
同样,它应该是企业级治理控制理事会的组成部分。
In the final maturity level, governance control is aligned with network partners.
在最后一个成熟度级别,治理控制是在网络伙伴间协调的。
Projects should be governed using a control loop to drive project variance to zero.Figure 8: project governance control loop.
应该用控制循环来管理项目,促使项目方差为零。
Projects should be governed using a control loop to drive project variance to zero.Figure 8: project governance control loop.
应该用控制循环来管理项目,促使项目方差为零。