Coordinate of next point was confirmed according to coordinate of front point, and then amount of feed of coordinates was calculated in interpolation cycle.
即根据前点位置坐标确定下点位置坐标,然后计算插补周期内两坐标的进给量。
Connecting with the construction case, this paper introduces the construction technique for suspended casting with form travelers with front-point and integral wood internal form.
结合工程实例,本文介绍了主梁前支点挂篮的悬浇及整体木内模施工技术。
Connecting with the construction case, this paper introduces the construction technique for suspended casting with form travelers with front-point and integral wood internal form.
结合工程实例,本文介绍了主梁前支点挂篮的悬浇及整体木内模施工技术。
应用推荐