• The flood peak is higher, the flood volume is greater and the flood duration is longer.

    洪水特点是峰高量大、持续时间长。

    youdao

  • Grassland and forest of watershed can drop down the flood peak and achieve self-restraint of the water.

    流域草地和林地具有消减洪峰,涵养水源的功能。

    youdao

  • Three Gorges Dam braces for second flood peak .

    三峡大坝做好准备,迎接第二次洪峰。

    youdao

  • The relation of design flood peak discharge rate to collecting area in Nenjiang River basin was discussed in this paper.

    探讨嫩江流域主要水文站设计洪峰流量与流域面积的关系。

    youdao

  • Finally, Suggestions are made to improve the methods for calculating the flood peak discharge of minor Bridges and culverts.

    最后对改进小桥涵设计洪峰流量的计算提出了建议。

    youdao

  • The lag time of the flood peak behind the peak of heavy area rainfall is shorter in small river basins than that in large basins.

    面雨量峰值出现时间与洪峰的出现时间之间存在着一定的滞后关系,一般是小流域滞后的时间短,而大流域滞后的时间长。

    youdao

  • Because of the complication of influence factor of flood, the relationship between flood peak level and flood peak discharge is uncertain.

    洪水影响因素复杂,洪峰水位和洪峰流量之间呈一种模糊关系。

    youdao

  • The parameters of the NAM hydrological model are researched on affecting the depth of runoff volume, flood peak flux and flood peak appearance time.

    利用灰色系统关联分析方法来研究NAM模型参数对模型模拟径流深、洪峰流量和峰现时间的影响。

    youdao

  • There is obvious delay and subduction function for the appearance and volume of flood peak by vegetation recovery and rebuilding of small watershed.

    小流域的植被恢复与重建对洪峰的出现和洪峰流量具有明显的延缓和削减作用。

    youdao

  • The difference is obvious between the computed flood hydrograph according to the traditional method and observed flood hydrograph, especially flood peak.

    目前常用矩法估计瞬时单位线,据此还原的洪水过程与实测洪水过程之间,特别是洪峰点之间,常具有明显的差别。

    youdao

  • On the basis of many research, a modified artificial neural network algorithm based on fuzzy theory is proposed to improve the forecasting precision of flood peak.

    在大量研究的基础上,提出了基于模糊理论的神经网络改进算法,用来提高对洪峰的预报精度。

    youdao

  • In comparison with dam site flood, the reservoir inflow flood has higher flood peak and greater flood volume in a short time interval, and its flood peak generally occurs earlier.

    入库洪水与坝址洪水相比一般峰现时间早前、洪峰增高、短时段洪量增加,而入库洪水成果在水库建成之前没有实测资料可以检验。

    youdao

  • The designed flood peak flow in storm sewer is usually calculated by adopting a constant average runoff coefficient at present in China, simple as it is, it's not reasonable enough.

    目前,我国采用单一地表的平均径流系数计算雨水管渠的设计洪峰流量,这虽然使计算简化,但不尽合理。

    youdao

  • The modeling result shows that land use structure and pattern change results in the increase of maxi- mum flood peak and flood discharge and the decreases of runoff concentration time.

    模拟结果表明,土地利用结构与格局的变化,使得暴雨洪水的最大洪峰流量和洪量加大,汇流时间变短。

    youdao

  • The effect of the parameters of the NAM hydrological model on the depth of runoff volume, flood peak discharge and flood peak appearance time was researched by GRA (grey relation analysis).

    利用灰色系统关联分析方法来研究NAM模型参数对模型模拟径流深、洪峰流量和峰现时间的影响。

    youdao

  • The flood characteristic of the main stream of Songhua river is that the flood is mainly from Nenjiang river, the flood hydrograph is gently, the time of propagation of flood peak is longer.

    松花江干流洪水特征是:洪水主要来自嫩江,洪水过程平缓,洪峰持续时间长。

    youdao

  • Wang Guangqian refutes this, saying that just a small proportion of the water flow is held back in the reservoirs, where it is stored up to create a flood peak, meaning no water is actually wasted.

    但王光谦认为,调水调沙仅仅是把小流量存在水库里,积攒起来制造洪峰,并无水的浪费。

    youdao

  • Wang Guangqian refutes this, saying that just a small proportion of the water flow is held back in the reservoirs, where it is stored up to create a flood peak, meaning no water is actually wasted.

    但王光谦认为,调水调沙仅仅是把小流量存在水库里,积攒起来制造洪峰,并无水的浪费。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定