As the spring thaw sets in and the canals fill up, this over spill freezes into a layer of ice.
当春季解冻开始,运河会溢满水,这些溢出来的水会结成一层冰。
The process of accumulation and dissipation of extra-static pore water pressure in fine-grained mud layer of tailings fill dam constructed by up-stream method is analysed.
本文对上游法修筑的尾矿坝的细粒泥层内超静孔隙水压力的积累和消散过程进行了分析。
The process of accumulation and dissipation of extra-static pore water pressure in fine-grained mud layer of tailings fill dam constructed by up-stream method is analysed.
本文对上游法修筑的尾矿坝的细粒泥层内超静孔隙水压力的积累和消散过程进行了分析。
应用推荐