• youdao

  • The estimated time in the work item appears as 4hrs, which we had modified from the My work view.

    这个工作条目中的估算时间显示为4小时,这是我们从MyWork视图中修改过的。

    youdao

  • You can also find the estimated time to get to that gas station, which is important if you’re running on fumes.

    此应用还能帮你估算出去到加油站大概所需的时间。如果你的爱车快没油了,这一功能便显得重要起来。

    youdao

  • Click the clock icon in the right corner of the work item, and change the estimated time to 4 hours (Figure 19).

    点击这个工作条目右角上的时钟图标,将估算时间更改为4小时(图19)。

    youdao

  • A script forwarded by a colleague finally solved the issue and the migration was finished within the estimated time (R6).

    同事送来的脚本最终解决了这个问题,移植操作最终在预计的时间内完成(R 6)。

    youdao

  • What's the estimated time of departure?

    火车大概是什么时候离开?

    youdao

  • Notification includes the exact shipping date and estimated time of arrival.

    通知包括确切的装船日期及预计到达时间。

    youdao

  • This estimated time of origin is decades earlier than the previous estimate of 1930.

    此次估计的起源时间比原以为的1930年要早数十年。

    youdao

  • I say again, UN001 mechanical problem, estimated time of departure (ETD) is delayed until 16:30.

    我再说一遍,UN001因机械故障,预计起飞时间推迟到16:30。

    youdao

  • For the first twenty minutes or so the installer seemed to be stuck with the estimated time remaining indicating 33 minutes.

    在开始大概二十分钟后,安装程序看起来就像是卡住了,其估计所需的剩余时间指示为33分钟。

    youdao

  • An estimated time is one year for each tier but exact timing will depend on the previous experience level and progress of individual physicians.

    一个阶段的时间估计为一年,但确切时间将取决于医生个体以往的经验水平和进步的程度。

    youdao

  • At the start of a project, the team probably compiles a schedule of the estimated time and person resources that will be needed to complete the tasks.

    在项目的开始阶段,团队可能编制出一个完成任务所需的估算时间和人力资源的进度安排。

    youdao

  • Once you choose to get directions, a list of routes pops up, with estimated time and traffic. You can switch routes by simply swiping on the bar.

    一旦你选择获取路线,一个线路列表就会弹出来,并注明了预计耗时以及路况。你只要在信息栏上水平滑动就可以切换线路。

    youdao

  • Discussing problems of how to forecast ETA (estimated time of arrival) in given bad weather conditions of an air-space within the reach of monitoring radars.

    研究了在危险天气条件下,在雷达管制空域下,计算航空器预达时间的问题。

    youdao

  • The Summary panel provides information on the task that will be deployed, hostname or IP address of the target machine, as well as the estimated time needed to deploy all tasks.

    Summary面板中提供了有关待部署的任务、目标计算机的主机名或IP地址以及部署所有任务估计花费时间的信息。

    youdao

  • As I understand it, you are also to inform us of the contract number, name of commodity, quantity, loading port and the estimated time when the goods will reach the port of loading.

    根据我的理解,你还应通知我方合同号码、商品名称、数量、装船港及货物估计到达装船港的日期。

    youdao

  • Precisely estimated time delay of acoustic wave signal is very important to implementing the most accurately measurement of temperature using acoustical method in the strong noise environment.

    声波信号时延的准确估计是实现强噪声环境下声学法高精度测温的关键。

    youdao

  • Estimated time needed for completing the application is 15 minutes or less.

    估计完成填写申请表的时间在15分钟以内。

    youdao

  • Estimated time needed for completing the application is 15 minutes or less.

    估计完成填写申请表的时间在15分钟以内。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定