to be responsible for quality supervision of transport infrastructure project and management of traffic engineering scale.
负责交通基本建设工程质量监督和交通工程定额管理。
The permeability value is magnitudes 2–4 lower for the laboratory scale against the engineering scale.
确定实验室尺度较工程尺度而言,煤岩介质渗透率低2~4个数量级。
The printing and dyeing wastewater was treated by a pulse cyclic fluidized bed(CFB) composite process with engineering scale of 5000m3/d.
采用脉冲循环流化床与物化沉淀池的组合工艺对某公司的印染废水进行了处理。
The printing and dyeing wastewater was treated by a pulse cyclic fluidized bed(CFB) composite process with engineering scale of 5000m3/d.
采用脉冲循环流化床与物化沉淀池的组合工艺对某公司的印染废水进行了处理。
应用推荐