It is the end of the engineering phase and the start of the flight testing phase.
现在是工程制造阶段的结束,飞行测试阶段的开始。
It is on track to be introduced in summer of 2012, and is still in the engineering phase, not early production. We suspect that poor battery life doomed the prior prototype version.
iPhone5将于2012年夏天发布,目前仍处于工程设计阶段,新机尚未产出,放弃此前原型机设计可能是因为电池续航时间不甚理想。
In the first phase, people recognized the need for software engineering instruction in the college curriculum.
在第一阶段,人们认识到在大学课程里讲授软件工程的需要。
At the tail end of the construction phase, the engineering team only had to fix defects that showed up in testing and update the remaining build and test documentation.
在构建阶段的末端,工程团队仅仅必须修改在测试和更新剩余的构建版本和测试文档中被显示的缺陷。
The initial contract for the engineering and manufacturing development phase includes design, development, integration and testing of the Flight Management System Suite (FMSS) for the AWACS aircraft.
这份预警机工程和制造初始合同开发阶段包括设计、开发、集成和飞行管理系统单元测试。
We wanted to get the engineering team involved as soon as possible, but our next set of tasks required a senior analyst to make more progress in the RUP inception phase, getting it well underway.
我们希望尽快的组成工程团队,但是我们接下来的任务需要一个高级的分析师以使RUP的初始阶段更有进展。
In traditional engineering, the bulk of time as well as of the cost is spent in production, while the architecture and design phase only contributes a minor part of time and cost.
在传统工程中,大部分时间和经费用于生产,而用于规划和设计阶段的仅占一小部分。
Fabric provides a business process for specifying and deciding on engineering change requests (ECRs) at the engineering change phase.
Fabric提供一个业务流程以在工程变更阶段指定和选定工程变更请求(ECRs)。
Although this phase involves some automated steps, such as reverse engineering, most of this process is done manually because every annotation is basically a high-probability guess.
虽然这个阶段的很多过程都是自动执行的,但是像逆向工程等等这些过程还是需要手动完成的,因为每一个注释都是根据它出现的概率推测出的。
Professor Liu claims that the second, practical phase of software engineering advancement in China began in the 1990s and has produced more than 3,000 software enterprises.
刘教授指出,中国软件工程业的第二个,即实践阶段开始于二十世纪九十年代并产生了3000余个软件企业。
This paper introduces the requirement phase, design phase, programming phase, test phase and maintenance phase of software engineering, and analyses some problems in them.
简要介绍了软件工程中的需求阶段、设计阶段、编程阶段、检验和测试阶段、维护阶段,并对其中的一些问题作了探讨。
PR's are raised during the Production engineering/breakdown phase of a contract by Drawing office and/or Production Engineering personnel.
在合同生产工程/细目分类阶段,由图纸办公室和/后生产工程人员提出请购单。
Provide the proprietor better and comprehensive plans that range from planning, designing, engineering, latter-phase management, and marketing.
为业主提供更完善的,从规划设计、工程、后期管理与市场营销的综合性方案。
Describes the whole process of applying value engineering to design of Fuxin Phase One boiler project, and very good economic and social effects.
论述了运用价值工程设计阜新一期锅炉工程的全过程及收到良好的经济效益和社会效益。
Nozzle Spray is very popular in power, chemical, agricultural, and environmental engineering, and it is an important part of the research on two-Phase flow.
喷嘴雾化在能源动力、化工、农业和环境工程中有非常广泛的应用,研究喷嘴雾化的流动特性是两相流研究中一个重要课题。
Systems analysis: in information processing, a phase of systems engineering.
系统分析:在信息处理之中,系统工程的一个阶段。
At the same time, it applies process controlling theory to engineering execution phase to control the items of B. Q, and discourses visa and claiming for compensation management.
同时,在工程实施阶段,运用过程控制原理控制各清单子目的完成情况,并对现场签证及索赔管理进行了论述。
As a new and effective method to withstand horizontal component of earthquake for building structure, the base isolation technique has been in the engineering application phase.
基础隔震技术为建筑结构抵御地震灾害提供了一种行之有效的全新方法,其水平地震分量的隔震技术已进入工程实用阶段。
The role of ILS in the program development and its application in each developing phase of engineering system are discussed in this paper.
探讨了综合后勤保障在工程系统研制中的重要作用,及其在研制过程各个阶段中的应用。
The simulating results show that the designed phase elements have a larger adaptability and they can fully meet the demands of the engineering applications.
结果显示,所设计的位相元件具有较大的适应性,完全可以满足工程应用的要求。
It can be used in every phase of civil engineering design with better practical applicability and is beneficial to improve the precision of design, efficiency would be promoted thereby.
本方法可用于土建工程设计的各个阶段;有较强的实用性,其应用有利于提高设计工作的精度和效率。
Based on value engineering, this article elaborate on application of value engineering in project management in different phase of of real estate project life cycle.
基于价值工程理论,以房地产开发项目的生命周期为脉络,阐述了在不同阶段,价值工程在项目管理中的应用。
This paper briefly analyzes the important significance erf construction cost management of investment decision phase in engineering construction.
本文简要分析了工程建设中投资决策阶段的工程造价管理在工程建设过程中所起的重要作用。
This paper analyzes the engineering bidding phase the meaning of cost control, and puts forward the bidding phase of engineering cost control measures.
本文分析了工程招投标阶段造价控制的意义,提出了招投标阶段工程造价的控制措施。
The project will begin with a study phase, followed by an Engineering Procurement and Construction (EPC) phase.
该项目将先从研究阶段开始,接着是工程采购和建设(EPC) 阶段。
The paper exhibits the significance of whole-process cost control of engineering project and the control methods in each phase.
介绍工程项目全过程造价控制的意义及各阶段的控制方法。
The control engineering construction cost, develops in the steel structure building technology economy the comprehensive superiority, the engineering design stage is the critical phase fully.
控制工程造价,充分发挥钢结构建筑技术经济上的综合优势,工程设计阶段是关键阶段。
The control engineering construction cost, develops in the steel structure building technology economy the comprehensive superiority, the engineering design stage is the critical phase fully.
控制工程造价,充分发挥钢结构建筑技术经济上的综合优势,工程设计阶段是关键阶段。
应用推荐