The article analyzes the reasons behind the disaster and provides some Suggestions for the flood control and drainage work in Yulin City.
文章分析了这次洪涝灾害的成因,并对解决玉林城区防洪排涝问题提出探讨性意见。
Therefore the general construction process scheme is worked out as follows: open trench drainage, work site dried in the sun, conventional butt welding, and pipe laid down into trench.
经过调研和反复现场勘察,确定的总体施工方案为:挖明沟排水,作业带晾晒,正常组对焊接,沉管下沟。
Therefore the general construction process scheme is worked out as follows: open trench drainage, work site dried in the sun, conventional butt welding, and pipe laid down into trench.
经过调研和反复现场勘察,确定的总体施工方案为:挖明沟排水,作业带晾晒,正常组对焊接,沉管下沟。
应用推荐