• The reviewer will consider the implications of the proposed deviation on approved design reports and in such instances will forward details to the PSG Engineering Director for review and acceptance.

    评审人员,将供应商提出的建议要求记录在经认可的设计报告中,并将详情提交给管架集团工程总监(PSG)评审和验收。

    youdao

  • The reviewer will consider the implications of the proposed deviation on approved design reports and in such instances will forward details to the PSG Engineering Director for review and acceptance.

    评审人员,将供应商提出的建议要求记录在经认可的设计报告中,并将详情提交给管架集团工程总监(PSG)评审和验收。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定