In aspects of heap carrying to prepare to press construction, relevant technique norm provision can pass generally level moves with sink to decline to prognosticate control to add the velocity.
在堆载预压施工方面,有关技术规范规定一般可通过水平位移和沉降观测来控制加荷速率。
In aspects of heap carrying to prepare to press construction, relevant technique norm provision can pass generally level moves with sink to decline to prognosticate control to add the velocity.
在堆载预压施工方面,有关技术规范规定一般可通过水平位移和沉降观测来控制加荷速率。
应用推荐