10 days prior to the date of shipment, inform the Buyer by telex or cable.
应在装船日前至少10天用电传或电报通知买方合同号、商品名称、数量、船名、船龄、船。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在船只受载期12天前将船名、预计受载日期、装载数量、合同号码、船舶代理人,以电报通知卖方。
Up to date, when designing the reasonable cable forces of cable-stayed Bridges, the special Bridges design process is adopted.
目前,在进行斜拉桥合理成桥状态设计时,通常都是采用专用桥梁设计程序。
The technology of combination of bolting wire mesh and cable anchor has been proved to be workable in permanent roadways, based on analysis of date collected from observations of roadway.
通过对锚网巷道监测数据的整理和分析,验证了在永久巷道中采用锚网带索联合支护技术是可行的。
This paper proposed a modem based on adaptive equalization and QAM in oil logging for cable telemetry communication systems with high date rate.
提出一种适用于石油测井领域高速电缆遥测通信系统,基于自适应均衡和QAM正交振幅调制技术的调制解调器的原理和实现方法。
Thee sellers shall, 30 days before the shipment date specified in the contract advise the buyers by CABLE/TELEX/FAX of the contract No.
卖方应在合同规定的装运日期前30天,以电报/电传/传真通知买方合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买方安排租船/订舱。
The civil aviation cable communication is closely relative to the cable date such as the trunk cable layout data, cable and fiber routing schematics data, the pipeline routing schematics data, etc.
民航有线通信工作与缆线的主干配线资料、电缆光缆路由图纸、管道路由图纸等有线资料密不可分。
From 1997 to date, China has 10 large production enterprises of the fiber optic cable.
从1997年至今,一直是我国10大光缆生产企业之一。
10 -15 days prior to the date of shipment, the Buyers shall inform the Sellers by cable if the contract number.
货物装运前10—15日,买方应电告卖方合同号、船只名称、船只预计到港日期、装运数量及船运代理人的名称,以便卖方可。
Electric Cables Handbook is an extensive source of up-to-date and essential information for electrical engineers, contractors, supply authorities and cable manufacturers.
电缆手册是由多达到日期和电气工程师,承包商,供应部门和电缆制造商的基本信息来源广泛。
Combination Type cable tray, the Second generation of XQJ series cable trays, is the most up-to-date.
组合式电缆桥架是一种最新形桥架,是电缆桥架系列中的第二代产品。
The technology of combination of bolting wire mesh and cable anchor has been proved to be workable in permanent roadways, based on analysis of date collected from observations of roadway.
主要阐述了在极破碎顶板条件下,应用锚网锚索联合支护的巷道围岩地质状况、支护方案、施工组织、安全措施及经济效果。
The technology of combination of bolting wire mesh and cable anchor has been proved to be workable in permanent roadways, based on analysis of date collected from observations of roadway.
主要阐述了在极破碎顶板条件下,应用锚网锚索联合支护的巷道围岩地质状况、支护方案、施工组织、安全措施及经济效果。
应用推荐