The cut slope natural stability is higher and its stability safety factor is 1.47 ~ 1.59.
通过计算分析表明:1、该路堑边坡自然稳定性较高,其稳定安全系数为1.47 ~ 1.59。
The high cut slope is the artificial steep slope transformed from natural pitch through human project activity.
高切坡是人类工程活动对自然斜坡的改造而形成的人工陡坡。
In this way, it has certain value of reference for the treatment of the rocky deep cut slope in mountainous area.
其对山区石质深路堑边坡处理有一定的参考价值。
The excavation of left bank abutment of the Hongjiadu hydroelectric project was the highest cut slope in the hydropower construction project then.
洪家渡水电站左岸坝肩工程为当时水利水电建设工程中最大高度的边坡开挖。
Both calculation and analysis are made on different slide surfaces. The research results are of significance for fast analysis on the stability of cut slope.
从不同滑移层面入手进行了分析计算,其成果对路堑边坡稳定性的快速分析有重要意义。
According to this, the stability analysis and treatment of technical research for expensive soils cut slope in Nanning-YouYiGuan expressway have been studied in this paper.
正是基于此,本文研究了南友路膨胀土堑坡稳定性分析方法与处治技术。
Based on the limit equilibrium theory and the hypothesis of planar sliding surface, a formula for calculating the Angle of shear failure was deduced considering cohesion and cut slope Angle.
基于极限平衡理论及平面滑裂面假定,在考虑土黏聚力及放坡角度的基础上,推导了平面滑裂面剪切破坏角的数学表达式。
By comparing the displacement change of other monitoring points with the reference point, the deformation response ration was obtained to determine the stable status of different cut slope positions.
计算出边坡其余部位的测点相对于参考点的变形响应率,通过响应率的变化趋势来判断边坡不同部位的稳定状况。
By comparing the displacement change of other monitoring points with the reference point, the deformation response ration was obtained to determine the stable status of different cut slope positions.
计算出边坡其余部位的测点相对于参考点的变形响应率,通过响应率的变化趋势来判断边坡不同部位的稳定状况。
应用推荐