• A new cut-fill method is adopted in the design of access road of Miaojiaba hydropower project by directly backfilling on the subgrade alluvium, and has probed a set of effective design method.

    苗家坝水电站对外公路在淤积层路段设计中采用了坡脚换填抗剪、在淤积层上直接回填路基的新方法,摸索出一套有效的设计方法。

    youdao

  • A new cut-fill method is adopted in the design of access road of Miaojiaba hydropower project by directly backfilling on the subgrade alluvium, and has probed a set of effective design method.

    苗家坝水电站对外公路在淤积层路段设计中采用了坡脚换填抗剪、在淤积层上直接回填路基的新方法,摸索出一套有效的设计方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定