In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.
该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。
A weighted critical path algorithm was provided to calculate the expectation value of the workflow's duration, record the process of reduction, and identify the time-oriented critical path.
通过加权关键路径算法,可以计算工作流完成时间的期望值及记录约简过程中的中间结果,从而确定工作流模型的关键路径。
It's brought forward an EVM evaluation method with critical path to hold the project progress well through comparing with BCWP and BCWS also with BCWP CP and BCWS CP in critical path at the same time.
本文提出了一种带关键路径的挣值法评价方法,在比较分析BCWP与BCWS的同时对关键路径上的BCWP与BCWS作比较,以便更准确地把握项目进度情况。
The article introduces the method of the critica1 path, confirms the limited time of a project through confirming the critical path and finds out critical activity of the project to shorten time.
文章介绍了确定关键路径的方法,通过确定关键路径以确定工程的工期并找出关键活动以缩短工期。
Given the critical signals, it USES techniques of data flow analysis to acquire the critical path set and choose the critical path coverage to be the fitness function used in the GA.
该平台的一个特点是,根据指定的关键信号使用数据流分析产生关键路径集合,并采用基于该集合的路径覆盖率作为适应度函数引导模拟矢量的生成。
Given the critical signals, it USES techniques of data flow analysis to acquire the critical path set and choose the critical path coverage to be the fitness function used in the GA.
该平台的一个特点是,根据指定的关键信号使用数据流分析产生关键路径集合,并采用基于该集合的路径覆盖率作为适应度函数引导模拟矢量的生成。