• This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.

    论述技术以及项目管理技术,并且根据图论技术项目管理技术设计关键路径算法以及网络图绘制算法。

    youdao

  • This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.

    由于系统网络形式进行工程管理,因此提供一个简单、直观制作网络图的平台。

    youdao

  • A weighted critical path algorithm was provided to calculate the expectation value of the workflow's duration, record the process of reduction, and identify the time-oriented critical path.

    通过加权关键路径算法可以计算工作流完成时间期望值记录约简过程中的中间结果,从而确定工作流模型关键路径。

    youdao

  • This paper presents the algorithm of acquiring the primary critical path.

    本文论述求解关键路径算法

    youdao

  • After studying conditions for generating PODCM in the critical path of data flow graph (DFG), an algorithm was introduced to produce PODCM.

    通过分析数据(DFG)关键路径生成PODCM条件,给出了DF G关键路径上生成PODCM算法并建立了PODCM库。

    youdao

  • Then a detailed ASIC design of the SHA-1 algorithm module is given, whose logic on the longest critical path is optimized.

    随后给出SHA - 1算法模块详细ASIC设计优化了SHA - 1模块最长关键路径逻辑结构。

    youdao

  • Then we present a scheduled critical path based algorithm.

    接下来我们提出基于调度关键路径算法。

    youdao

  • The verification automaton and the algorithm for abstracting critical path are proposed to verify high level synthesis process automatically.

    为了便于自动验证高层综合过程给出了验证自动机模型

    youdao

  • The verification automaton and the algorithm for abstracting critical path are proposed to verify high level synthesis process automatically.

    为了便于自动验证高层综合过程给出了验证自动机模型

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定