As a kind of newly developing business, its charge system and communication course control are closely combined together.
作为一种新兴业务,其计费系统与通信过程控制非常紧密地结合在一起。
The most important problem of the construction enterprise is the construction cost control, and the construction cost control can be divided into advance control, course control and after control.
施工企业最突出的问题是施工成本控制,施工成本控制可分为事先控制、事中控制(过程控制)和事后控制。
The water feed whole-course control system used in China-bult 300mw unit is described.
阐述了国产300MW机组的锅炉给水全程控制系统。
Ship course control is closely related with navigation security, maneuverability and economy.
船舶航向控制与航行的安全性、可操纵性和经济性密切相关。
Combining with the course control of rope core diameters of steel wire ropes for elevators, the FMEA table is established.
结合电梯用钢丝绳绳芯直径过程控制,建立电梯用钢丝绳绳芯直径潜在失效模式及后果分析表。
Thus, the efficient control of project cost for construction units can be guaranteed through implementing whole course control.
通过实施全过程控制来保证对建设单位有效控制工程造价。
The quality assurance system stresses leader's effect and course control and has acted positively in guiding producing control of oil production factory (OFF).
该体系强调领导者作用,注重过程控制,对采油厂的实际生产管理,起到了积极的指导作用。
We hope through the study of the ADRC controller in ship course control to expand the applications of the ADRC and to provide a new thinking to ship course control strategy.
本文希望通过对自抗扰控制在航向运动控制中的研究,进一步拓展自抗扰控制技术的应用领域,也为船舶航向控制器控制策略的研究提供一种新的思路。
A dynamic neural fuzzy model (DNFM) based adaptive control algorithm for ship course control was developed to overcome uncertainties arising from changes of model parameters.
针对船舶航向控制中模型参数变化引起的不确定性问题,提出一种基于动态神经模糊模型(DNFM)的自适应控制算法。
The success or failure of the software project depend on the developing course control in a great extent, this includes control in quality, source code, progress, fund, personnel, etc.
软件项目的成败在很大程度上取决于对其开发过程的控制,这包括对质量、源代码、进度、资金、人员等的控制。
The success or failure of the software project depend on the developing course control in a great extent, this includes control in quality, source code, progress, fund, personnel, etc.
软件项目的成败在很大程度上取决于对其开发过程的控制,这包括对质量、源代码、进度、资金、人员等的控制。
应用推荐