The standard cost of each group can be used for the cost quality control.
针对各个组合计算费用标准值用于费用质量控制。
Control production cost, improve production quality to achieve annual cost quality target.
控制生产成本,提高产品质量以达到年度质量目标。
Monitoring and control technique for resistance spot welding quality is a high efficiency, low cost quality assurance measure.
电阻点焊质量监测技术是一种高效率、低成本的质量保障措施。
I think the company places too much stress on cost and not enough on quality.
我认为公司对成本强调有余,而对质量重视不足。
Such services don't cost too much—quality services can be found for upwards of 30 pounds a month.
这样的服务成本不高,优质服务每月的费用仅需30多英镑。
Virtually all experts agree that the fee-for-service system—doctors are rewarded for the quantity of care rather than its quality or effectiveness—is a primary reason that the cost of care is so high.
事实上,所有的专家都同意按服务收费的系统——医生的报酬取决于医疗服务的数量,而不是质量或效率——是医疗成本如此高的一个主要原因。
But what is the cost of high quality?
但是什么是高质量的成本呢?
Most projects measure cost and time, but scope and quality affect cost and time and need to be measured as well.
大多数项目度量成本和时间,但是范围和质量影响了成本和时间,因此也需要度量。
The reuse of assets within the project can have a significant bearing on the project schedule, cost, and quality of the delivered system.
工程中资产的重新利用对于工程的时间进度表,成本,以及可交付系统的质量有十分重要的意义。
The areas of cost, quality of product, support from software provider, and internal resources to support software should be evaluated against a proprietary solution.
费用范围、产品质量、软件供应者的支持以及支持软件的内部资源都应该以专有方案为标准加以评估。
It is also a tenet of an agile, iterative methodology, representing a significant improvement over waterfall in terms of risk, cost, quality, and efficiency.
这还是敏捷、迭代的方法的宗旨,表现出就风险、成本、质量,和效率而言,在瀑布模型上的重大改善。
The strategic positions refer also to strategic groups following the same strategy along the strategic dimensions (cost, quality, and focus).
战略定位还指在各个战略维度(成本、质量、聚焦)遵循相同战略的战略集团。
Deviations: a project is given a certain set of parameters within which to operate, such as cost and quality.
偏差:项目有给定的要操作的某个参数集合,例如成本和质量。
Most important, continuously ensuring quality will always cost less than ignoring quality considerations.
最重要的是,持续保证质量总是会比忽略考虑质量成本要低。
Most were small, domestically oriented firms that combined low cost, low quality and exploitation of workers, says Mr Hassenfeld.
哈森·菲尔德先生说,其中绝大多数是小规模的、面向国内的公司,它们成本低、质量差并且剥削工人。
From these four variables, fix time, cost, and quality — but not scope.
在这4个变量中,可以修改时间、成本和质量——但范围除外。
Patients need to have clear, reliable data about cost and quality before they make decisions about their care.
患者需要明确可靠的医疗产品和服务信息以便他们能够在做决定之前进行考虑和取舍。
On what criterion or differentiating characteristic will we compete? cost? quality? reliability? delivery?
我们将用什么标准或鉴别特征、成本、质量、可靠性、送货来竞争?
Design of 3d models with CATIA V5 from the first concept to the final product according to functional, cost, quality and manufacturing requirements.
运用CATIAV 5设计3d模型,从最初的概念到最终产品,以达到功能,成本,质量以及生产的要求。
The project manager spends time planning, managing, assessing, and controlling scope, time, cost, quality, risk, resources, and customer satisfaction.
项目经理花时间做的事情包括:规划、管理、分派任务,控制范围、时间成本、质量、风险、资源和客户满意度。
The application of compound machining technology, no matter from the technology, progress, cost, quality, etc are one of the best choice.
复合加工的应用,无论从工艺、进度、成本、质量等方面都是一个最佳选择的方案。
Delivering continuous improvement in cost, quality and delivery.
持续改进成本,质量和交付周期。
A change in scope MUST be evaluated for its impacts to time, cost, quality, risk, resources, and customer satisfaction. The project manager has enough data about the project to do this analysis.
范围变更的影响必须被评估,包括时间、成本、质量、风险、资源和客户满意度,项目经理有足够数据做这些分析。
Responsible to manage the total factory operation in Nanping to out-perform our competition in Cost, Quality and Delivery.
负责南平整个工厂的营运,以达到在产品成本、质量和交货期方面超越竞争对手。
BPR is a complete reconsider and redesign procedure for business process so as to radically improve some key performance indexes like cost, quality, service and speed.
BPR是为了实现关键性能指标如成本、质量、服务和速度等方面的根本改进而对业务流程彻底地再思考和再设计的过程。
Design of 3d models with CATIA V5 from the first concept to the final product according to functional, cost, quality and manufacturing requirements.
根据部件的功能,成本,质量以及生产的要求,能运用CATIAV5从最初的概念到最终的产品进行3d模型设计。
In other words, it includes the management and control of schedule, cost, quality and data.
从内容和目标上讲包括上述全过程的进度、费用、质量和数据的管理与控制。
Push suppliers to achieve "BestPractice" in cost, quality, service and delivery. Keep inclose cooperation with the sites.
推动供应商的成本、质量、服务和交付期均达到“最佳状态”,和各业务团队保持紧密合作。 。
Push suppliers to achieve "BestPractice" in cost, quality, service and delivery. Keep inclose cooperation with the sites.
推动供应商的成本、质量、服务和交付期均达到“最佳状态”,和各业务团队保持紧密合作。 。
应用推荐