Increased cost of project cancellations.
增加了取消项目的成本。
So it reduces the cost of project and expands the range of application.
这样,不仅大大降低了系统的成本,还扩大了系统的应用场合。
How to minimize risk, testing time and cost of project for modernization of existing or new building hot rolling mill are up-to-date subjects.
在热连轧精轧机组的改造或新建过程中,如何降低生产风险,减少调试时间和降低成本是当前的研究热点。
The result of simulation indicates that, by determining pitch radius appropriately, the system driver can be used more effectively and the cost of project can be saved.
仿真结果表明:适当选取下平台铰点支座分度圆半径能更充分地利用系统的动力源,提高工程的经济性。
The result of simulation indicates that, by determining pitch radius appropriately, the system driver can be used more effectively and the cost of project can be saved.
仿真结果表明:适当选取下平台铰点支座分度圆半径能更充分地利用系统的动力源,提高工程的经济性。
应用推荐