It provides a valuable input for cost estimation, scheduling, and evaluating the progress of the project.
它是成本估算、日程、评估项目进展时会用到的很有价值的输入。
While information technology makes it possible to multiply and distribute content worldwide and almost at no cost, legal restrictions on the reuse of copyright material hamper progress.
虽然信息技术使复制内容并在世界范围内发行成为可能,而且几乎没有成本,但关于重用保留版权的资料的法律规章却阻碍进步。
Delaying the deployment of code that you write allows you to present apparent progress (" we're delivering code every iteration ") at the cost of long-term success.
拖延代码部署导致了我们用长期成功的成本来展示仅仅表象的进步(“每一次反复我们都在提交代码”)。
Complete a cost-free step to achieving a dream — Too often we let money get in the way of progress.
完成一个免费的步骤来完成一个梦想——太多的时候我们会让金钱介入到实现梦想的过程当中。
The measure of progress is a business measure: like the number of sales, profit margins, or cost cuttings.
这种进度指标是业务指标:就像销售量、利润率或成本消减。
In the process of contracting, these risks will produce a great influence on the project progress, its cost and quality control.
在工程承包过程中,这些风险因素都可能给工程进度、费用、质量的控制造成极大影响。
The research is mainly focused on the optimization of Project management with Cost, Quality and Progress, puts forward the method of optimization.
文中着重研究了项目管理在成本、质量和进度三个方面的优化问题,分别提出了优化的方法。
The application of compound machining technology, no matter from the technology, progress, cost, quality, etc are one of the best choice.
复合加工的应用,无论从工艺、进度、成本、质量等方面都是一个最佳选择的方案。
The correct selection of investigative plan will enhance the project progress, ensure quality and save cost.
其勘察方案选择的正确与否,直接影响到工程进度、勘察质量与勘察费用。
The key of low cost strategy for a petroleum engineering project is to effectively control the project progress, its cost and quality.
石油工程项目实施低成本战略,关键是对项目的进度、成本与质量进行有效地控制。
Importance of strengthening project technical management, and how to carry out quality, safety management, progress management, cost management and construction site management are elaborated.
本文论述了加强工程技术管理的重要性和怎样搞好质量管理、安全管理、进度管理、成本管理、施工现场管理的方法和步骤。
Technical preparation work is very important, and it is a precondition of ensuring project progress and quality, decreasing project cost and offering good field HSE management.
安装工程开工前的技术准备工作非常重要,它是保证工程进度、工程质量、降低工程成本、搞好现场HSE管理的先决条件。
There are many uncertainties and risks in the construction process of EPC turnkey projects, which will definitely affect the progress, quality, safety and the realization of cost goals.
EPC总承包项目在施工过程中存在较多的不确定因素和风险,势必影响其进度、质量、安全和成本目标的实现。
The work expects the progress to the construction item, quality and cost to have the influence of different degree.
工期对建设项目的进度、质量和成本有着不同程度的影响。
The effect of tax on enterprise's technological progress embodies in enterprise's technological progress cost and income.
税收与企业技术进步的相关性,主要体现在税收对企业技术进步成本和收益的影响。
We can accelerate the progress, economize the cost and improve the quality of the survey, if we manage the comprehensive investigation methods in the survey of the railway.
在铁路工程地质勘察工作中,采用综合勘察方法,可以达到提高勘察质量,加快勘察进度,节约勘察成本的目标。
The cost of application tradition and the time limit management cannot mirror exactly the performance level of cost and progress, not to mention the integration control of information.
应用传统的成本和工期管理已经不能够准确反映出成本与进度的绩效水平,更不能进行信息的集成控制。
Determining production and cost, and controlling both during the progress of the work.
确定和控制产值、成本这两项工作都在工程的进度中。
But this progress was at the cost of the worsening of the economy conditions and the status of the general peasants. Only the minority improved their status.
但这种进步是以广大农民经济状况和地位的恶化为代价的,只有少数农民地位改善。
So the cost of the project, progress, control of resources has put forward higher requirements.
这样对项目的成本、进度、资源控制提出了更高的要求。
Third, project control management of network enterprise is researched, including the progress control management, cost control management and quality control management.
其三,重点研究了网络企业项目控制管理,包括进度控制管理、成本控制管理和质量控制管理。
Municipal Engineering team-building is a complex process; the team will have a direct impact on the successful progress of the project, cost, and three key quality factors.
市政工程团队建设是一项复杂的工作,团队建设的成功与否直接影响工程进度、成本、质量三个关键因素。
On the basis of quality, how to carry out progress and cost management is the key of project management .
在保证工程质量的前提下,如何进行进度和成本管理是项目管理的关键。
CMOS technology has the advantages of low cost and high integration and has exhibited more and more superiorities in high frequency circuits along with the progress of CMOS manufacturing technology.
CMOS技术有着低成本、高集成度等优点,随着CMOS工艺技术的不断进步,使它在高频电路有了更好的表现。
CMOS technology has the advantages of low cost and high integration and has exhibited more and more superiorities in high frequency circuits along with the progress of CMOS manufacturing technology.
CMOS技术有着低成本、高集成度等优点,随着CMOS工艺技术的不断进步,使它在高频电路有了更好的表现。
应用推荐