Third party cost evaluation of the eighteenth party.
第十八条第三方造价评估。
The focus of this paper is to try to build URT external cost evaluation system.
本文的重心在于,分析评价城市轨道交通的外部成本。
Ill. 2 shows the cost evaluation of some typical refurbishment and renovation measures.
图2表示的是某些常见的翻修和改造措施的成本评估。
In plan optimization module, the access path selection and the account method of cost evaluation are discussed in detail.
在计划优化模块中,详细讨论了存取路径的选择和代价评估的计算方法。
Understanding the essence of the costing problem and holding the principles of cost evaluation and selection are the key to the problem.
认识代价问题的本质,把握代价评判和代价选择的准则,是问题之关键。
The theory of multiple variable linear regression equation and grey system forecast was applied to resolve cost evaluation of the weapon system.
该文应用回归分析和灰色系统预测理论建立参数方程,解决武器系统制造成本估算问题。
The concurrent cost evaluation model based on feature is built. The influence of the feature change at design stage on the product cost is studied.
建立了以特征为基本处理单元的并行成本估算模型,研究了产品设计过程中特征变化对产品成本的影响。
Beijing city's TDM policy assessment system is constituted and includes benefit and cost evaluation, equity evaluation, acceptability evaluation, and feasibility evaluation.
建立北京市交通需求管理措施适用性评价体系,包括实施效益评价、成本评价、公平性评价、可接受性评价和可实施性评价。
The research method and the proposed index may provide valuable reference for cost evaluation works of Chinese rural power network transmission and transformation construction projects.
研究方法及其评价指标为我国农网输变电工程造价水平评价工作提供了有价值的参考。
According to the URT external cost evaluation system, the author gets the result that the external costs of rail transportation is much smaller than those of other transportation methods.
根据城市轨道交通外部成本的评价内容,得出轨道交通的外部成本与其他交通运输方式相比,还是小得多。
The paper analyzes the economy attribute of cost price from multi-opinion, and develops a mathematic model on the basis of the discussion of the theory of cost evaluation, and also studies the method.
从多个角度分析了成本价的经济属性,对成本价的评审理论进行了深入地探讨并得出了其数学模型,据此理论展开了成本价评审方法的研究。
A series of tables are formulated on the economic indices adopted in the feasibility study of the project, cost evaluation, cash flows, internal earnings, profit evaluation, sensitive factor analysis.
根据第三部分中风险分析的结果,编制了项目可行性研究经济指标、成本估算表、现金流量及内部收益率、利润测算表、敏感因素的影响等一系列表单;
Groove Virtual Office is available at no cost for personal use or 60-day business evaluation.
Groove虚拟办公室可供个人免费使用,商务使用则可以有60天的评估使用期。
Distribute sale task, workout a evaluation method for responsibility and cost.
分解销售任务指标,制定责任、费用评价办法;
By contract risk evaluation, risk disposal ability evaluation and risk strategy cost calculation, proposes the contract risk allocation model based on engineering dynastic operation.
并以合同风险评价、风险处置能力评估、风险策略成本测算为依托,提出了基于工程动态运行的合同风险分配模型。
Based on the cost and profit, cost and result, cost and avail theory of health economy, this paper studys the evaluation system of hospital economy management and its mode.
运用卫生经济学成本效益、成本效果、成本效用的理论,研究我军医院经济管理评价体系及运行模式。
The content of the evaluation consists of two parts: educational achievements and the cost of them.
评估的内容由教育成果和教育成本两部分组成。
Cost analysis is the base of benefit evaluation.
成本分析是效益评价的基础。
Evaluation analysis about tax cost and tax agent for other tax items.
税收成本测算分析及其他各项税种的代理申报。
Retrieval performance includes evaluation of recall ratio, precision ratio, speed of retrieval, cost and convemence etc.
检索性能主要包括查全率、查准率、检索速度、费用与方便性等指标。
Therefore the establishment of cost accounting and evaluation of heating system is very necessary.
因此建立供热成本核算和评估体系是非常必要的。
Function evaluation methods usually include function cost method and function index method.
功能评价方法常采用功能成本法和功能指数法。
The definition and process and application of cost - benefit analysis on project evaluation are summarized, which puts the people's attention on environment into the feasible study of the projects.
介绍了费用效益分析的定义、步骤以及其在项目评估中的应用,从而把人们对环境的关注纳入到项目的可行性研究中。
This paper discusses in detail the purpose of value design, function analysis, cost and value evaluation, and also points out the value optimization and examples.
文中详细讨论了价值设计的目的,功能分析,产品成本和价值评价,给出了价值优化的模型及例子。
This paper studies the construction of the coal burning power plant and presents a synthetic evaluation method for the construction quality cost analysis and the construction quality evaluation.
本文以火电厂建设工程为研究对象,提出了建设工程质量成本分析和建设工程质量综合评价方法。
Concepts of fermentation economy, market demands, new products development, industrial cost, evaluation for fermentation and benefit analysis.
发酵过程经济学相关概念,市场需求,新产品开发,生产成本等;发酵过程经济评价和效益分析。
By classifying the route firstly, then sorting route by cost in the same class, the route evaluation can be solved efficiently in the case of various mission constraints and part conflicts.
该方法采用先对航迹分类、同类间按代价排序的方法,有效地解决了在约束条件多、部分约束条件互相冲突情况下的航迹评价问题。
By classifying the route firstly, then sorting route by cost in the same class, the route evaluation can be solved efficiently in the case of various mission constraints and part conflicts.
该方法采用先对航迹分类、同类间按代价排序的方法,有效地解决了在约束条件多、部分约束条件互相冲突情况下的航迹评价问题。
应用推荐