• Is it covered in the cost estimate?

    在最初的成本估算时将它算在内了吗?

    youdao

  • A rough cost estimate for a solution.

    对解决方案的粗略成本估算。

    youdao

  • Table 5: Process improvement cost estimate.

    表5:过程改进成本估计。

    youdao

  • The return is based on the cost estimate and the potential revenue estimates. 5.

    收益是基于成本估计和潜在收入估计的。

    youdao

  • However, in order to get the best cost estimate, the optimizer needs the values that will be used when the query executes.

    然而,为了获得最佳的开销评估值,优化器需要获得查询执行时使用的值。

    youdao

  • C. To get a better cost estimate.

    为了得到一个较好的成本估算。

    youdao

  • Normal cost estimate 450 a month!

    一个月正常开销估计450元!

    youdao

  • I make a cost estimate.

    我写成本估算单。

    youdao

  • Our cost estimate was way off the mark.

    我们对成本的估计太离谱了。

    youdao

  • Specific items in the detailed cost estimate become job cost elements.

    详细成本估算中的具体项次成为工作成本要素。

    youdao

  • Cost budgeting-allocating the overall cost estimate to individual work items.

    费用预算-总费用分配到单个工作项目上。

    youdao

  • The project without cost estimate and benefit analysis is often out of control.

    未进行成本估算和效益分析就进行软件项目开发,往往会导致项目失控。

    youdao

  • His cost estimate was way off base, far higher than warranted by current prices for labor and materials.

    他的成本估计太离谱了,不合理地远远高于目前劳力和材料的价格。

    youdao

  • Generally, the accuracy of a cost estimate will reflect the information available at the time of estimation.

    总的来说,估价的准确程度将反映估价时所获取的信息。

    youdao

  • For materials in collective requirements, the existing cost estimates are transferred into the new cost estimate.

    对集中需求的物料,已经存在的成本核算数据被传递到新的成本核算中去。

    youdao

  • The cost estimate for those SITEs would be delivered to OPERATOR within 5 business days following the actual SITE visit.

    承包商必须在实地勘测站点后5个工作日内提交工程的成本估价给运营商。

    youdao

  • Research on software support cost estimate model is important to the precision and efficiency of software cost estimate.

    软件保障模型估算的研究对提高软件保障费用估算的精度和效率有重要意义。

    youdao

  • Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.

    把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。

    youdao

  • Software cost estimate with the traditional experience function has the shortcoming, and applying CBR estimate method can make up these problems.

    用传统的经验函数估算软件成本有很多局限性,采用基于范例库推理的估算方法可以很好地弥补其中的问题。

    youdao

  • As the staff member gains in-depth insight into the impact of the database field length increase, he can give a better cost estimate for this modification.

    通过深入了解增加数据库字段长度的影响,可以更准确地估计这一修改的成本。

    youdao

  • The practice indicated that the cost management system of software project based on RUP could manage the cost estimate and management more successfully.

    实践结果表明,基于RUP的软件项目成本管理系统是指导软件开发机构进行项目成本估算和管理的一个较为有效的工具。

    youdao

  • A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.

    在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。

    youdao

  • Take part in the technical improvement discussion, problems analysis after handover; make cost estimate, instruction and acceptance of internal improvements.

    参与项目交接后技术改进的讨论以及问题分析,制定技改工作的费用估算,实施指导,内部验收确认。

    youdao

  • During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.

    在初步设计、施工图设计阶段分别编制初步设计概算书和施工图设计预算书,进一步优化成本预算。

    youdao

  • Have three-year college degree (or equivalent education level), at least 3 years experience in cost estimate and budget as well as experience in construction site.

    具有大专以上学历(或同等级别的教育经历),在工程造价专业方面有3年以上工作经验以及工程现场的预结算工作经历。

    youdao

  • This paper describes the software project cost estimate model based on RUP. Based on the survey, a software project cost management system is designed and realized.

    在对基于RUP的软件项目成本估算模型进行研究的基础上,本文设计并实现了基于RUP的软件项目成本管理系统。

    youdao

  • Two alternative means will be provided for making an approximate structural cost estimate: one on a square foot of building basis, and another on volumes of structural materials used.

    有两种可供选择的方法将用来进行结构造价的近似估价:其一是根据单位平方英尺建筑面积,另一种则是根据所用的结构材料体积进行估价。

    youdao

  • The next point Reeves makes is about the cost of manufacturing, which generally isn't considered part of the engineering effort but is part of the overall cost estimate for a engineered artifact.

    Reeves接下来的观点是关于制造成本的,制造成本通常不算工程的一部分,但是是工件的总体成本估计的一部分。

    youdao

  • In this paper, the cost estimate system of constructional engineering has been studied based on the theory of Fuzzy Mathematics and Grey system, and a practical computer software has been worked out.

    本文利用模糊数学和灰色系统理论,对建筑工程造价估测系统进行了研究,并在此基础上,研制成实用软件。

    youdao

  • The “one-tenth of the cost” estimate is based on rosy assumptions.

    所谓1/10费用的估计是基于乐观的假设的。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定