Schedules for remotely developed subsystems often slipped, even with a capable team at the remote site, because they didn.t have access to the same resources that the core engineering team did.
对于远程开发的子系统的计划经常不能按时完成,因为远程的开发团队不能访问和核心工程团队一样的资源。
Schedules for remotely developed subsystems often slipped, even with a capable team at the remote site, because they didn.t have access to the same resources that the core engineering team did.
对于远程开发的子系统的计划经常不能按时完成,因为远程的开发团队不能访问和核心工程团队一样的资源。
应用推荐