• Finally, the procedures and methods of the control of contract risk and gathering risk are discussed in connection with a job in marketing.

    最后,结合营销工作,探讨了预控合同风险与收款风险的程序和方法。

    youdao

  • The reasonable contract size can be determined based on rule of three and contract risk value rule.

    合约规模是否合理可通过比例法和合约风险价值法来判断。

    youdao

  • Abstract: Based on the engineering contract risk analysis, elaborates the three principles of project contract risk allocation.

    [摘要]在对工程合同风险进行分析的基础上,阐释了工程合同风险分配的三大原则。

    youdao

  • Abstract: This paper firstly defined construction contract risk and the foreseeable risk principle on the basis of the risk's meaning.

    [摘要]首先根据风险的内涵界定了工程合同风险的内涵及可预见性风险分配原理。

    youdao

  • The risk type of industrial management mainly consists of natural risk, market risk, asset risk, technology risk, contract risk and etc.

    农业产业化经营的风险类型主要包括自然风险、市场风险、资产风险、技术风险和契约风险等。

    youdao

  • Finally, takes the dispute of a hospital inpatient building construction price settlement to illustrate the application method of construction contract risk boundaries.

    以某医院综合住院部大楼工程价款结算的争议为例,说明建设工程施工合同风险边界的应用方法。

    youdao

  • By contract risk evaluation, risk disposal ability evaluation and risk strategy cost calculation, proposes the contract risk allocation model based on engineering dynastic operation.

    并以合同风险评价、风险处置能力评估、风险策略成本测算为依托,提出了基于工程动态运行的合同风险分配模型。

    youdao

  • Bonds investment faces interest rate risk, reinvesting risk, breaking contract risk, and inflation risk, while stock instruments face dividend indefinite risk and price indefinite risk.

    而股票投资面临着股利收益不确定风险和股票价格不确定风险。

    youdao

  • Bonds investment faces interest rate risk, reinvesting risk, breaking contract risk, and inflation risk, while stock instruments face dividend indefinite risk and price indefinite risk.

    而股票投资面临着股利收益不确定风险和股票价格不确定风险。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定